IN THE UNITED STATES DISTRICT COURT

FOR THE DISTRICT OF NEW MEXICO ___________________________

ASCENT ENERGY, LLC,

Plaintiff,

vs. 2:21-cv-00326-KWR-CG

REACH WIRELINE, LLC,

Defendant.

MEMORANDUM OPINION AND ORDER

THIS MATTER comes before the Court upon the Defendant’s Motion to Dismiss (Doc. 12). Having reviewed the parties’ pleadings and the relevant law, the Court finds that Defendant’s motion is not well-taken and, therefore, is DENIED. BACKGROUND

This is a contract dispute stemming from oil and gas fracking operations. Plaintiff operated a well, and Defendant agreed to provide wireline services for the well. Plaintiff alleges that Defendant provided a defective wireline for use during its well operations. A wireline is a cable thousands of feet long used to lower equipment into a well. Doc. 21 at 1. During the well operations, the line snapped. It allegedly cost Plaintiff more than $700,000 to fish the debris out of the well. The parties entered into a Master Services Agreement (“MSA”). In the agreement, Defendant gave several warranties, and agreed to “maintain [its] equipment in good operating condition at all times.” Id. at ¶ 14. Defendant represented that it had “adequate equipment in good working order and fully trained personnel capable of efficiently operating such equipment and performing [wireline] services for” Plaintiff. Id. at ¶ 13 In September 2020, Defendant provided Plaintiff with wireline, equipment, and services for use at a well near Hobbs, New Mexico. Plaintiff alleges that the wireline was visibly damaged and corroded, and that Defendant

knew that the wireline was defective. Despite this defect, Defendant allegedly advised Plaintiff that it could increase the tension on the wireline from 3,100 pounds to 5,000 pounds. Doc. 1 at ¶ 18-19. The wireline subsequently snapped. Plaintiff spent approximately $700,000 to fish the wireline from the well. Plaintiff alleges that the day after the incident, Schlumberger Limited issued a report commissioned by Defendant. The report concluded that Defendant supplied a highly and visibly corroded and damaged wireline. The report noted there was a 2-3 inch chip missing from the outer jacket of the wireline. It noted damage along the wireline, including severe pitting on all wires, severe corrosion, and white rust on the wireline. Id. at ¶ 23-24. The report stated that Defendant’s

representatives at the well site “found the outer armors looked corroded, were extremely fragile, and would break easily when bent outwards…” Id at ¶ 25. The report concluded that “since that jacket damage was not repaired, its[sic] very likely that armor damage and corrosion started at this specific cable depth… and developed over time… outer armors were likely weakened over time from mechanical abrasion and corrosion… root cause of this failure can be attributed to armor corrosion.” Id. at ¶ 26, 27. Plaintiff alleged that Defendant was aware of the damage to the cable but decided to furnish it to Plaintiff anyway. Plaintiff asserts the following claims: Count I: Breach of Contract Count II: Breach of Warranty Defendant filed a motion to dismiss for failure to state a claim under Fed. R. Civ. P. 12(b)(6). Doc. 12. LEGAL STANDARD Rule 12(b)(6) permits the Court to dismiss a complaint for “failure to state a claim upon

which relief can be granted.” Fed. R. Civ. P. 12(b)(6). To survive a motion to dismiss, a plaintiff’s complaint must have sufficient factual matter that if true, states a claim to relief that is plausible on its face. Ashcroft v. Iqbal, 556 U.S. 662, 677 (2009) (“Iqbal”). As such, a plaintiff’s “[f]actual allegations must be enough to raise a right to relief above the speculative level.” Bell Atlantic Corp. v. Twombly, 550 U.S. 544 (2007) (“Twombly”). All well-pleaded factual allegations are “viewed in the light most favorable to the nonmoving party.” Brokers’ Choice of Am., Inc. v. NBC Universal, Inc., 757 F.3d 1125, 1136 (10th Cir. 2014). In ruling on a motion to dismiss, “a court should disregard all conclusory statements of law and consider whether the remaining specific factual allegations, if assumed to be true, plausibly suggest the defendant is liable.” Kan. Penn

Gaming, LLC v. Collins, 656 F.3d 1210, 1214 (10th Cir. 2011). Mere “labels and conclusions” or “formulaic recitation[s] of the elements of a cause of action” will not suffice. Twombly, 550 U.S. at 555. DISCUSSION

Defendant argues that indemnity provisions in the MSA prohibit Plaintiff from bringing the breach of contract and warranty claims. Defendant asserts that under these indemnity provisions, Plaintiff agreed to release Defendant for all costs incurred to fish Defendant’s broken wireline from the well. The Court disagrees, and at this procedural posture, declines to dismiss the claims on this basis. The MSA provides that Texas law applies. Doc. 1-1 at § 10.3. The parties generally appear to agree that Texas law applies in construing the contract. See Doc. 21; Doc. 12 (applying Texas law). Under Texas law, “[i]n construing a written contract, the primary concern of the court is to ascertain the true intentions of the parties as expressed in the instrument.” J.M. Davidson, Inc. v. Webster, 128 S.W.3d 223, 229 (Tex. 2003). A contract’s words should be ascribed their “plain,

ordinary, and generally accepted meaning.” El Paso Field Servs., L.P. v. MasTec N. Am., Inc., 389 S.W.3d 802, 808 (Tex. 2012) (internal quotation marks omitted). A court must “consider the entire writing in an effort to harmonize and give effect to all the provisions of the contract so that none will be rendered meaningless.” J.M. Davidson, 128 S.W.3d at 229. “No single provision taken alone will be given controlling effect; rather, all the provisions must be considered with reference to the whole instrument.” Id. At the motion to dismiss stage, if a court “cannot say with certainty that [a party’s] breach-of-contract claims are defeated by the plain language of the [contract],” the motion to dismiss should be denied. U.S. Enercorp, Ltd. v. SDC Mont. Bakken Exploration, LLC, 966 F. Supp. 2d 690, 708-09 (W.D. Tex. 2013).

Plaintiff alleges that Defendant breached the terms of the MSA and breached implied warranties. Defendant asserts that the indemnity provision in Section 7.4 of the MSA releases the claims in this case. Section 7.4 provides as follows: SUBJECT TO CONTRACTOR'S INDEMNITY OBLIGATIONS IN SECTION 7.2, COMPANY SHALL RELEASE CONTRACTOR GROUP FROM AND PROTECT, INDEMNIFY, DEFEND AND HOLD HARMLESS CONTRACTOR GROUP FROM ANY AND ALL CLAIMS RELATED TO OR IN CONNECTION WITH THE AGREEMENT AND REGARDLESS OF FAULT FOR:

Free access — add to your briefcase to read the full text and ask questions with AI

Ascent Energy, LLC v. Reach Wireline, LLC, (D.N.M. 2021).

Ascent Energy, LLC v. Reach Wireline, LLC (Ascent Energy, LLC v. Reach Wireline, LLC) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

Bell Atlantic Corp. v. Twombly
550 U.S. 544 (Supreme Court, 2007)
Ashcroft v. Iqbal
556 U.S. 662 (Supreme Court, 2009)
Kansas Penn Gaming, LLC v. Collins
656 F.3d 1210 (Tenth Circuit, 2011)
J.M. Davidson, Inc. v. Webster
128 S.W.3d 223 (Texas Supreme Court, 2003)