Armco Chile Prodein, S.A. v. The M/V Norlandia

880 F. Supp. 781, 1995 U.S. Dist. LEXIS 8164, 1995 WL 131538
CourtDistrict Court, M.D. Florida
DecidedMarch 27, 1995
DocketNo. 90-1081-Civ-J-20
StatusPublished
Cited by6 cases

This text of 880 F. Supp. 781 (Armco Chile Prodein, S.A. v. The M/V Norlandia) is published on Counsel Stack Legal Research, covering District Court, M.D. Florida primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Armco Chile Prodein, S.A. v. The M/V Norlandia, 880 F. Supp. 781, 1995 U.S. Dist. LEXIS 8164, 1995 WL 131538 (M.D. Fla. 1995).

Opinion

ORDER AND OPINION

SCHLESINGER, District Judge.

Trial in this cause was held before the undersigned. Based on the testimony and evidence received during trial, and the applicable legal standards, the Court makes the following findings of fact and conclusions of law, as required by Rule 52(a) of the Federal Rules of Civil Procedure.

Plaintiffs, Armco Chile Prodein, S.A. (“Armeo”) and Compañía De Seguros Cruz Del Sur, S.A. (“Cruz”), are suing the M/V Norlandia, in rem, and Scheepvaartmij Antigua (“Antigua”), in personam. This is an admiralty and maritime claim within the meaning of Rule 9(h) of the Federal Rules of Civil Procedure. This Court has jurisdiction of this cause pursuant to 28 U.S.C. § 1333.

This is an action for damage to a cargo of filament wound, fiberglass reinforced pipes [785]*785carried aboard the NORLANDIA from Jacksonville, Florida to Talcahuano, Chile in November of 1989. The owner of the pipes, Armco, and its insurer, Cruz, have brought this action against the vessel and its owner, Antigua, to recover for damage to the pipes.

H.A. Simons is an engineering/construetion firm in Vancouver, British Columbia. H.A. Simons contracted with Celluloso del Pacifi-co, S.A. (“Celpac”), a Chilean company, for construction of a paper mill in Renaico, Chile.

Armco is a Chilean company engaged in the business of manufacturing and selling filament wound, fiberglass reinforced pipes. Armco contracted with Celpac to supply approximately 27 kilometers of filament wound, fiberglass reinforced pipes to be used to transport the effluent from Celpac’s paper mill near Renaico, Chile to a distant river.

The contract between Armco and Celpac set forth a delivery schedule requiring delivery of a certain number of pieces of pipe per month between November of 1989 and November of 1990.

Armco, knowing that it might not have its pipe plant in Chile on-line in time to meet the delivery schedule for the pipes, negotiated a provision in its contract with Celpac allowing Armco to subcontract the manufacture of a portion of the pipes to Price Brothers, Inc. (“Price Brothers”), which is located in Green Cove Springs, Florida.

Armco contracted with Price Brothers to manufacture 497 pieces of pipe. Each of the 497 pieces measured sixty feet in length. 207 pieces measured 900mm in inner diameter. 290 pieces measured 100 mm in inner diameter.

It was Armco’s responsibility to ship the pipes from Florida to Chile. Thus, Armco entered into a coniine booking note with Meridian Ship, Inc. (“Meridian”)1 on October 30, 1989. See Coniine Booking Liner Booking Note (Plaintiffs’ Ex. No. 45).

Meridian was in the business of locating cargo owners interested in having their cargoes shipped. Meridian contracted with those owners for shipment and then chartered (i.e., leased) vessels from various shipowners who actually performed the transportation aboard the vessel. Meridian specialized in project cargoes.

The booking note called for direct transit from Jacksonville to Talcahuano. See Clause 7 of the Addendum to the Booking Note. The booking note also stated that Meridian was to oversee the packing of the cargo. See Clause 6 of the Addendum to the Booking Note.

Meridian chartered the NORLANDIA from Antigua, the owner of the vessel, to use in connection with the transportation of Arm-eo’s/Price Brothers’ pipes. See Charter Party (Plaintiffs’ Ex. No. 81).

The charter party expressly gave Meridian authority to sign bills of lading on behalf of the master of the NORLANDIA. See Clause 33 of the Charter Party (Plaintiffs’ Ex. No. 81).

Prior to shipping the- pipes, Meridian received details concerning the nature, characteristics and strength of the pipes. Armco provided Meridian with the dimensions and weights of the pipes. At a meeting in October of 1989, Price Brothers provided Meridian with information concerning tensile strength, ovality and hoop strength, among other things.

Meridian also asked Armco about permissible stacking heights. In response to this, Meridian was informed that if the carrier wished to stack four high, then the upper tier should consist of unnested pipes, and stiffeners should be placed between the lower two tiers so that the weight of the upper tiers would be borne by the stiffeners rather than the pipes. See Plaintiffs’ Ex. Nos. 17 and 39.

The freight for the ocean voyage was calculated by volume. To minimize the cost, the pipes were nested. This means that the 900mm pipes were inserted into the 1000mm pipes.

These nested pipes were then placed two (2) across on nine (9) wooden saddles. The saddles or cradles were made of 4" x 6" timbers with chocks to prevent the pipes from rolling.

[786]*786Only one rate of freight was offered for the transportation of the pipes. Alternate freight rates were not offered.

Armco insured the cargo under a policy of all-risk cargo insurance which provided the coverage for the damages forming the basis of this litigation.

Cruz is a Chilean insurance company that provided cargo insurance to Armco for the fiberglass pipes that were carried aboard the NORLANDIA.

After the pipes were nested and packaged, Price Brothers loaded the pipes onto trucks for transport from Green Cove Springs to the Jacksonville dock. The pipes were properly constructed and in good order and condition and free of starbursts, cracks, craz-ings, delaminations and any other damage when they left Price Brothers’ plant on trucks for the Jacksonville dock. Price Brothers’ quality control inspectors examined each and every pipe after manufacture and supervised the nesting and loading onto the trucks.

Jerry Winters, Price Brothers’ plant manager, and Jack Welch, Meridian’s pipe engineer/project consultant, accompanied the first few truckloads from Price Brothers’ plant to the dock. Mr. Winters and Mr. Welch observed that the transit from Green Cove Springs to Jacksonville occurred without incident.

On or about November 23, 1989, the cargo of 497 fiberglass pipes was delivered to Defendants at the port of Jacksonville, Florida.

Mr. Winters was in attendance when the initial loads of pipe were discharged from the trucks. Mr. Winters instructed the ocean carrier and its stevedores on the proper techniques to be used in off-loading the pipes from the trucks. Mr. Winters was satisfied that the pipes were properly off-loaded from the trucks and landed on the dock in good order and condition.

The pipes on the dock were inspected and no damage was found. Furthermore, no resin was found on the trucks that transported the pipes from Green Cove Springs to Jacksonville.

The shipment of this cargo is evidenced by a bill of lading issued on or about November 24, 1989. Meridian’s agent, Palmetto Shipping and Stevedoring Company, Inc., (“Palmetto Shipping”) signed the bill of lading. The bill of lading is evidence that the cargo was delivered in apparent good order and condition.

The pipes were loaded on the NORLAN-DIA both below-deck and on-deck.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Atwood Oceanics, Inc. v. M/V PAC Altair
191 F. Supp. 3d 1328 (S.D. Alabama, 2016)
Voltaire v. Home Services Systems, Inc.
823 F. Supp. 2d 77 (E.D. New York, 2011)
Allstate Insurance v. Palterovich
653 F. Supp. 2d 1306 (S.D. Florida, 2009)
Kelso Enterprises, Ltd. v. M/V WISIDA FROST
8 F. Supp. 2d 1197 (C.D. California, 1998)
Armco Chile v. M/v Norlandia
104 F.3d 370 (Eleventh Circuit, 1996)

Cite This Page — Counsel Stack

Bluebook (online)
880 F. Supp. 781, 1995 U.S. Dist. LEXIS 8164, 1995 WL 131538, Counsel Stack Legal Research, https://law.counselstack.com/opinion/armco-chile-prodein-sa-v-the-mv-norlandia-flmd-1995.