Acuity v. Society Insurance

2012 WI App 13, 810 N.W.2d 812, 339 Wis. 2d 217, 2012 WL 15376, 2012 Wisc. App. LEXIS 8
CourtWisconsin Supreme Court
DecidedJanuary 5, 2012
DocketNo. 2009AP2432
StatusPublished
Cited by12 cases

This text of 2012 WI App 13 (Acuity v. Society Insurance) is published on Counsel Stack Legal Research, covering Wisconsin Supreme Court primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Acuity v. Society Insurance, 2012 WI App 13, 810 N.W.2d 812, 339 Wis. 2d 217, 2012 WL 15376, 2012 Wisc. App. LEXIS 8 (Wis. 2012).

Opinion

HIGGINBOTHAM, J.

¶ 1. This case arises out of damages suffered by VPP Group, LLC, stemming from construction work being performed by contractors on a building owned by VPP VPP was insured by Acuity. Acuity paid the damage claims filed by VPP arising out of the construction work. Acuity then filed a subrogation action against the contractors and their insurer, Society Insurance. Society moved for summary judg[221]*221ment. The circuit court granted the motion and declared that Society's CGL policies did not provide coverage for damages caused VPP by the contractors because there was no "occurrence" within the meaning of the policies under the facts of this case.1 Because we conclude that the damages suffered by VPP are a result of an "occurrence," the economic loss doctrine does not bar coverage and no business risk exception in the policy applies, we conclude there is coverage under Society's policy. We therefore reverse the circuit court's order for summary judgment and remand to the circuit court for further proceedings.

BACKGROUND

¶ 2. VPL Ron Stoikes d/b/a RS Construction (RS), and Terry Luethe d/b/a Flint's Construction (Flint) entered into a contract to remove and reinstall a concrete wall on the south side of the "engine room" building which provided refrigeration and necessary utility services to VPP's entire animal processing plant. The contract, in the form of a "Bid Memo," was dated May 21, 2006, and set forth the following terms: "Bid to include labor for Removal & installation of 49' x 22' h concrete wall[;] Also include shoring & related work." The total contract price was $8500.

¶ 3. The work contracted for was limited to removal and replacement of the engine room's south wall. VPP supplied all materials; RS and Flint provided all labor. RS and Flint began work in late May 2006. RS [222]*222first shored up the engine room and removed the existing wall to grade level. The VPP processing plant continued at full operation during this phase of the work.

¶ 4. On June 12, 2006, during Flint's excavation of a trench adjacent to the south wall site, the soil began to erode from under the concrete slab of the first floor of the engine room. As a result, the engine room's first floor slab cracked and a portion deflected downward. The part of the building above the compromised floor, including the second floor and roof, likewise deflected downward. The engine room's masonry walls adjacent to the south wall also sustained damage. As a result of this damage to the engine room, the utility service to the rest of the processing plant was disrupted, including electrical service, anhydrous ammonia, and the refrigeration functions of the engine room's roof top condenser. Also, the roof top condenser was disabled because the water required to run it was too heavy for the damaged roof. Due to this damage, the entire processing plant's refrigeration capacity was reduced by twenty-five percent. In addition to the engine room itself, an adjacent building which shared a common wall incurred large cracks in the cooler housed inside it, which impaired its ability to cool processed beef.

¶ 5. Beef being processed must be rapidly cooled, and the processing is monitored by United States Department of Agriculture (USDA) on-site inspectors during all processing shifts. Because of the reduced refrigeration capacity, VPP had to change its processing schedule, adding an extra animal "kill" day, to ensure that it could fill its customer orders. Because of the need to add another "kill" day, VPP incurred costs for additional personnel hours, additional USDA inspectors' hours, extra freight and fuel charges, and other expenses in the amount of approximately $380,000.

[223]*223¶ 6. VPP repaired the engine room by replacing that portion of the first floor concrete slab that had cracked, jacking up the second floor level to its original level and replacing portions of the roof slab that had cracked. Only after these repairs were made was RS able to complete the original job of rebuilding the south wall.

¶ 7. VPP contacted its insurer, Acuity, following the loss. After adjusting the losses, Acuity paid a total of $636,466.39 to VPP in final settlement of the loss claims, which amount included the $380,000 claimed for the extra expenses and the remainder representing the damages relating to repairs to the building. Not included in this amount were the costs to VPP related to replacing the south wall.

¶ 8. Acuity commenced this subrogation action against RS and Flint and their insurer, Society Insurance, seeking to recover damages arising from the engine room collapse, and alleging breach of contract and negligence. The applicable policy language states:

1. Business Liability.

a. We will pay those sums that the insured becomes legally obligated to pay as damages because of.. . "property damage"... to which this insurance applies.
b. This insurance applies:
(1) to ... "property damage" only if:
(a) The. . . "property damage" is caused by an "occurrence" that takes place in the "coverage territory" ____

The policy defines "Property damage" as:

a. Physical injury to tangible property, including all [224]*224resulting loss of use of that property. All such loss of use shall be deemed to occur at the time of the physical injury that caused it; or
b. Loss of use of tangible property that is not physically injured. All such loss of use shall be deemed to occur at the time of the "occurrence" that caused it.

¶ 9. The policy also includes two exclusions which Society contends bars coverage:

This insurance does not apply to:

k. Damage To Property

"Property damage" to:
(5) That particular part of real property on which you or any contractor or subcontractor working directly or indirectly on your behalf is performing operations, if the "property damage" arises out of those operations; or
(6) That particular part of any property that must be restored, repaired or replaced because "your work" was incorrectly performed on it.

¶ 10. Society moved for summary judgment, asserting that based on the above language of the CGL policy it issued to RS and Flint, there was no liability coverage for VPP's loss. The circuit court granted Society's motion for summary judgment, finding there was no "occurrence" under Society's policy. Acuity appealed. Additional facts, as necessary, are set forth in the discussion below.

DISCUSSION

¶ 11. The issue on appeal is whether there is coverage for VPP's claims under Society's CGL policies [225]*225issued to RS and Flint. We review a grant of summary judgment de novo, applying the same methodology as the circuit court. State v. Bobby G., 2007 WI 77, ¶ 36, 301 Wis. 2d 531, 734 N.W.2d 81. Summary judgment is appropriate when the affidavits and other submissions show that no genuine issue of material fact exists and the moving party is entitled to judgment as a matter of law. Wis. Stat. § 802.08(2).

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Riverback Farms, LLC v. Saukville Feed Supplies, Inc.
2023 WI App 40 (Court of Appeals of Wisconsin, 2023)
5 Walworth, LLC v. Engerman Contracting, Inc.
2023 WI 51 (Wisconsin Supreme Court, 2023)
Terry Wiegert v. TM Carpentry, LLC
2022 WI App 28 (Court of Appeals of Wisconsin, 2022)
5 Walworth, LLC v. Engerman Contracting, Inc.
2021 WI App 51 (Court of Appeals of Wisconsin, 2021)
Uneeda Rest, LLC v. Rick Hexum
Court of Appeals of Wisconsin, 2020
Maya Elaine Smith v. Jeff Anderson
2017 WI 43 (Wisconsin Supreme Court, 2017)
Edward E. Gillen Co. v. Insurance Co. of Pennsylvania
874 F. Supp. 2d 755 (E.D. Wisconsin, 2012)

Cite This Page — Counsel Stack

Bluebook (online)
2012 WI App 13, 810 N.W.2d 812, 339 Wis. 2d 217, 2012 WL 15376, 2012 Wisc. App. LEXIS 8, Counsel Stack Legal Research, https://law.counselstack.com/opinion/acuity-v-society-insurance-wis-2012.