588 F.2d 979
7 O.S.H. Cas.(BNA) 1034, 1979 O.S.H.D. (CCH) P 23,321
Ray MARSHALL, Secretary of Labor, Petitioner,
v.
WEST POINT PEPPERELL, INC. and Occupational Safety and
Health Review Commission, Respondents.
No. 77-2156.
United States Court of Appeals,
Fifth Circuit.
Feb. 1, 1979.
Carin A. Clauss, Sol. of Labor, U. S. Dept. of Labor, Washington, D. C., Michael H. Levin, Counsel, for Appellate Litigation, Arthur J. Amchan, Atty., for petitioner.
Lovic A. Brooks, Jr., J. Richard Walton, Chris Mitchell, Fred M. Richardson, Atlanta, Ga., Allen H. Sachsel, Appellate Section, Civil Division, Dept. of Justice, Washington, D. C., Ray H. Darling, Jr., Executive Secretary, OSHRC, Benjamin W. Mintz, Assoc. Sol. for OSH, Washington, D. C., for respondents.
Petition for Review of an Order of the Occupational Safety and Health Review Commission.
Before BROWN, Chief Judge, TUTTLE and THORNBERRY, Circuit Judges.
JOHN R. BROWN, Chief Judge:
Pursuant to the Occupational Safety and Health Act, the Secretary of Labor has promulgated a regulation, 29 C.F.R. § 1910.95(b)(1), requiring employers to implement "Feasible administrative or engineering controls" in order to protect their employees from exposure to harmful levels of occupational noise. In 1974, the Secretary cited West Point Pepperell, Inc., a textile manufacturer, for violations of that noise regulation, and an administrative law judge affirmed the citation in pertinent part. The Occupational Safety and Health Review Commission, however, vacated the citation, and the Secretary now petitions for review of the Review Commission's order.
When all is said and done, there is less to this case than meets the eye. Resolution of this petition does not require us to decide delicate and important questions of policy and congressional intent in providing, "so far as possible, every working man and woman in the Nation safe and healthful working conditions." Rather, it merely requires us to read the Review Commission's order and then decide what the Commission said in that order. The Secretary vigorously contends that the order announces an erroneous legal principle namely, that engineering controls are not technologically "feasible," and therefore employers are not required to implement them under 29 C.F.R. § 1910.95(b)(1), unless such controls have been fully developed and marketed by disinterested third parties. West Point Pepperell, on the other hand, contends that the Commission simply made a factual determination, supported by substantial evidence, that the state of technology in the textile industry in 1974 was such that there were no "feasible" engineering controls for significantly reducing the level of occupational noise in its mill. We agree with West Point Pepperell's reading of the order and therefore affirm.
The Regulatory Background
The Occupational Safety and Health Act (the Act) empowers the Secretary of Labor to promulgate safety and health standards "reasonably necessary or appropriate to provide safe or healthful employment and places of employment," See 29 U.S.C. §§ 655, 652(8), and obligates employers to comply with those standards and regulations validly promulgated by the Secretary, 29 U.S.C. § 654(a)(2). Numerous medical and psychological studies document the serious effects of excessive noise exposure. Pursuant to his statutory authority the Secretary of Labor, through the Occupational Safety and Health Administration (OSHA), has responded to the dangers of occupational noise and has promulgated 29 C.F.R. § 1910.95(b)(1). That regulation provides that
(w)hen employees are subjected to sound (levels) exceeding those listed in Table G-16, feasible administrative or engineering controls shall be utilized. If such controls fail to reduce sound levels within the levels of Table G-16, personal protective equipment shall be provided and used to reduce sound levels within the levels of the Table.
This standard reflects the determination that the preferable method for abating hazardous noise exposure is through technological or administrative controls such as the installation of noise-damping materials to machine surfaces and work-room walls, the substitution of quieter machines, processes, or parts for noisy ones, and the rotation of workers to minimize their exposure to high sound intensities. But if such engineering or administrative controls are not "feasible," then workers shall be provided with and required to wear personal protective devices i. e., earplugs and earmuffs that successfully attenuate their exposure to excessive noise levels.
Table G-16 defines excessive noise exposure in terms of decibels (dB) as measured on the "A scale/slow response," and prescribes 90 dBA as the maximum permissible exposure for an 8-hour workday. An important feature of decibel measuring is that decibel levels increase logarithmically rather than arithmetically. "Every increase of 10 dB represents an increase of approximately 300 percent in sound pressure. A 100 dB noise is, therefore, 3 times as intense as a 90 dB noise, rather than about 10 percent more intense, as might be expected."
Employer noncompliance with 29 C.F.R. § 1910.95(b)(1) or any other standard or regulation promulgated by the Secretary under the Act may result in the issuance of citations and the imposition of fiscal penalties. See 29 U.S.C. §§ 658(a), 659(a), 666. If the employer observes certain procedural requirements, it is entitled to an administrative hearing and review by the Occupational Safety and Health Review Commission of any such penalty or citation to abate a violation. 29 U.S.C. § 659(c). The Act provides that the administrative law judge (ALJ) who conducts the hearing shall make a "report of any * * * determination which constitutes his final disposition of the proceedings." 29 U.S.C. § 661(i). That report becomes the final order of the Review Commission unless one of the three Commissioners exercises his discretion to have the report reviewed by the Commission itself, in which case the decision of the Commissioners constitutes the final administrative determination. See id.; see generally Accu-Namics, Inc. v. Occupational Safety and Health Review Commission, 5 Cir., 1975, 515 F.2d 828, 834-35, Cert. denied, 1976, 425 U.S. 903, 96 S.Ct. 1492, 47 L.Ed.2d 752.
Pointing A Finger At West Point
Respondent West Point Pepperell, Inc. (West Point), is a large textile manufacturer. In 1974, on OSHA compliance officer inspected West Point's mill in Lindale, Georgia, and found steady noise levels of 90-97 dBA in Weave Room No. 2, which contained 112 Draper Shuttleless Looms (DSLs), and 98-103 dBA in Weave Room No. 3, which contained 1,178 Draper Fly-Shuttle Looms (DFSLs).
Free access — add to your briefcase to read the full text and ask questions with AI
588 F.2d 979
7 O.S.H. Cas.(BNA) 1034, 1979 O.S.H.D. (CCH) P 23,321
Ray MARSHALL, Secretary of Labor, Petitioner,
v.
WEST POINT PEPPERELL, INC. and Occupational Safety and
Health Review Commission, Respondents.
No. 77-2156.
United States Court of Appeals,
Fifth Circuit.
Feb. 1, 1979.
Carin A. Clauss, Sol. of Labor, U. S. Dept. of Labor, Washington, D. C., Michael H. Levin, Counsel, for Appellate Litigation, Arthur J. Amchan, Atty., for petitioner.
Lovic A. Brooks, Jr., J. Richard Walton, Chris Mitchell, Fred M. Richardson, Atlanta, Ga., Allen H. Sachsel, Appellate Section, Civil Division, Dept. of Justice, Washington, D. C., Ray H. Darling, Jr., Executive Secretary, OSHRC, Benjamin W. Mintz, Assoc. Sol. for OSH, Washington, D. C., for respondents.
Petition for Review of an Order of the Occupational Safety and Health Review Commission.
Before BROWN, Chief Judge, TUTTLE and THORNBERRY, Circuit Judges.
JOHN R. BROWN, Chief Judge:
Pursuant to the Occupational Safety and Health Act, the Secretary of Labor has promulgated a regulation, 29 C.F.R. § 1910.95(b)(1), requiring employers to implement "Feasible administrative or engineering controls" in order to protect their employees from exposure to harmful levels of occupational noise. In 1974, the Secretary cited West Point Pepperell, Inc., a textile manufacturer, for violations of that noise regulation, and an administrative law judge affirmed the citation in pertinent part. The Occupational Safety and Health Review Commission, however, vacated the citation, and the Secretary now petitions for review of the Review Commission's order.
When all is said and done, there is less to this case than meets the eye. Resolution of this petition does not require us to decide delicate and important questions of policy and congressional intent in providing, "so far as possible, every working man and woman in the Nation safe and healthful working conditions." Rather, it merely requires us to read the Review Commission's order and then decide what the Commission said in that order. The Secretary vigorously contends that the order announces an erroneous legal principle namely, that engineering controls are not technologically "feasible," and therefore employers are not required to implement them under 29 C.F.R. § 1910.95(b)(1), unless such controls have been fully developed and marketed by disinterested third parties. West Point Pepperell, on the other hand, contends that the Commission simply made a factual determination, supported by substantial evidence, that the state of technology in the textile industry in 1974 was such that there were no "feasible" engineering controls for significantly reducing the level of occupational noise in its mill. We agree with West Point Pepperell's reading of the order and therefore affirm.
The Regulatory Background
The Occupational Safety and Health Act (the Act) empowers the Secretary of Labor to promulgate safety and health standards "reasonably necessary or appropriate to provide safe or healthful employment and places of employment," See 29 U.S.C. §§ 655, 652(8), and obligates employers to comply with those standards and regulations validly promulgated by the Secretary, 29 U.S.C. § 654(a)(2). Numerous medical and psychological studies document the serious effects of excessive noise exposure. Pursuant to his statutory authority the Secretary of Labor, through the Occupational Safety and Health Administration (OSHA), has responded to the dangers of occupational noise and has promulgated 29 C.F.R. § 1910.95(b)(1). That regulation provides that
(w)hen employees are subjected to sound (levels) exceeding those listed in Table G-16, feasible administrative or engineering controls shall be utilized. If such controls fail to reduce sound levels within the levels of Table G-16, personal protective equipment shall be provided and used to reduce sound levels within the levels of the Table.
This standard reflects the determination that the preferable method for abating hazardous noise exposure is through technological or administrative controls such as the installation of noise-damping materials to machine surfaces and work-room walls, the substitution of quieter machines, processes, or parts for noisy ones, and the rotation of workers to minimize their exposure to high sound intensities. But if such engineering or administrative controls are not "feasible," then workers shall be provided with and required to wear personal protective devices i. e., earplugs and earmuffs that successfully attenuate their exposure to excessive noise levels.
Table G-16 defines excessive noise exposure in terms of decibels (dB) as measured on the "A scale/slow response," and prescribes 90 dBA as the maximum permissible exposure for an 8-hour workday. An important feature of decibel measuring is that decibel levels increase logarithmically rather than arithmetically. "Every increase of 10 dB represents an increase of approximately 300 percent in sound pressure. A 100 dB noise is, therefore, 3 times as intense as a 90 dB noise, rather than about 10 percent more intense, as might be expected."
Employer noncompliance with 29 C.F.R. § 1910.95(b)(1) or any other standard or regulation promulgated by the Secretary under the Act may result in the issuance of citations and the imposition of fiscal penalties. See 29 U.S.C. §§ 658(a), 659(a), 666. If the employer observes certain procedural requirements, it is entitled to an administrative hearing and review by the Occupational Safety and Health Review Commission of any such penalty or citation to abate a violation. 29 U.S.C. § 659(c). The Act provides that the administrative law judge (ALJ) who conducts the hearing shall make a "report of any * * * determination which constitutes his final disposition of the proceedings." 29 U.S.C. § 661(i). That report becomes the final order of the Review Commission unless one of the three Commissioners exercises his discretion to have the report reviewed by the Commission itself, in which case the decision of the Commissioners constitutes the final administrative determination. See id.; see generally Accu-Namics, Inc. v. Occupational Safety and Health Review Commission, 5 Cir., 1975, 515 F.2d 828, 834-35, Cert. denied, 1976, 425 U.S. 903, 96 S.Ct. 1492, 47 L.Ed.2d 752.
Pointing A Finger At West Point
Respondent West Point Pepperell, Inc. (West Point), is a large textile manufacturer. In 1974, on OSHA compliance officer inspected West Point's mill in Lindale, Georgia, and found steady noise levels of 90-97 dBA in Weave Room No. 2, which contained 112 Draper Shuttleless Looms (DSLs), and 98-103 dBA in Weave Room No. 3, which contained 1,178 Draper Fly-Shuttle Looms (DFSLs). All of these looms were manufactured by the Draper Division of the North American Rockwell Corporation, which is the nation's largest producer of looms. The noise created by these looms was due to the vibration of various machine parts, the grinding of pinion gears, and the impact of various loom parts during normal operation of the looms. Weave room employees worked virtually their entire 8-hour shifts in the midst of this deafening noise, although some of the noise was muted by the personal ear protective devices West Point required them to wear. The Secretary of Labor cited West Point for failing to implement feasible engineering controls to reduce or eliminate the harmful loom noise in either of the two weave rooms, proposed a civil penalty of $300 for the two violations, and ordered West Point to submit an engineering compliance program and periodic progress reports.
West Point contested this citation in a timely fashion, and, after formal pleadings had been filed before the Review Commission, the case was tried before a Commission ALJ. Fourteen volumes of testimony was heard from a number of employees, scientists, engineers, and doctors.
A portion of the testimony concerned the effectiveness of earplugs and earmuffs in reducing the actual exposure of workers to loom noise. Evidence was introduced to the effect that all weave room employees at the Lindale Mill had been tested and fitted with personal ear protective devices, that employees were required to wear these devices at all times in high noise areas, and that if properly fitted and continuously worn, the devices reduced actual noise exposure 20-25 dBA, well within the 90 dBA maximum.
West Point employees also testified about the efforts made by the Company to reduce loom noise at its source. Some of these failed, such as attempts to substitute machine parts made of plastic and other soft materials (which were unable to withstand the wear and tear of normal operations) and the construction of shields or baffles (which interfered with observation of and access to the looms). Other efforts had limited success, such as mounting the looms on floor pads designed to isolate loom vibration and wider spacing of the looms. These efforts notwithstanding, however, it was undisputed that the noise levels in Weave Room Nos. 2 and 3 exceeded the 90 dBA level that 29 C.F.R. § 1910.95(b)(1) permits where feasible administrative or engineering controls are available.
The testimony of four witnesses related to the crucial question of whether in fact there existed in 1974 feasible administrative or technological methods by which significant noise reduction could be achieved in the two weave rooms. On the basis of this testimony, the ALJ concluded that while there was no persuasive evidence concerning administrative controls, with regard to engineering controls "the preponderance of the credible evidence establishes that it was feasible to reduce the noise level in Weaving Room No. 2 by at least 5 dBA." He therefore affirmed the citation with respect to the shuttleless looms in Weave Room No. 2. Although he also concluded that materials and techniques were available to lower somewhat the sound levels of the fly shuttle looms in Weave Room No. 3, he vacated the citation with respect to that weave room because he found that the level in that room, even with the controls, would still exceed 90 dBA.
The Review Commission's Decision
The Review Commission exercised its prerogative to review the ALJ's report and vacated the citation in its entirety. The Commission reviewed the testimony of the witnesses in some detail and concluded, in explicit terms, that "the evidence does not establish that the technology exists to achieve significant noise attenuation in either of the two weave rooms." Contrary to the assertion of the Secretary on this appeal, and to the dissent of Commissioner (now Chairman) Cleary, the Commission did not predicate its decision on the principle that engineering noise controls are not technologically feasible unless they have been developed, tested, and marketed by a third-party supplier.
As explained in Accu-Namics, supra, the Review Commission itself is the fact-finder under the Act, and the Court of Appeals reviews only the final order of the Commission. 515 F.2d at 834. Upon such judicial review, the Commission's findings of fact are conclusive if supported by substantial evidence in the record considered as a whole. 29 U.S.C. § 660(a); Accu-Namics, 515 F.2d at 834-35. Having determined that the Commission's decision was the rather straightforward factual one that in 1974 there were no feasible technological methods for significantly reducing noise levels in the weave rooms at West Point's Lindale mill, the only issue that remains for us to determine is whether that factual finding was supported by substantial evidence.
Substantial Evidence?
The sole witness for the Secretary of Labor on the issue of technological feasibility was Dr. Ronald Bailey, who was an assistant professor of mechanical and aerospace engineering with a doctorate and extensive research experience in noise and vibration control. Dr. Bailey testified at length concerning the sources of DSL and DFSL noise and the application of basic engineering principles by which the looms could, at least in theory, be modified to reduce noise during their operation. He also described several loom modification kits that Draper was developing but had not yet marketed, as well as his own laboratory tests on a single loom using sound-absorbing and damping materials similar to those being tested by Draper. On the basis of the various engineering principles and these laboratory tests, Dr. Bailey stated that in his opinion the noise levels in both Lindale weave rooms could be reduced by at least 5 dBA. Upon questioning, however, he conceded that he would not make a "blanket recommendation" that textile manufacturers immediately install his proposed loom modifications because he had not conducted a "feasibility study."
Three of West Point's witnesses also addressed the technological feasibility of reducing loom noise. The vice-president of another textile manufacturer agreed with the soundness of the engineering principles advanced by Dr. Bailey, but stated categorically that the "application of those principles * * * in a weave room is not today available (to) (p)rovide a substantial reduction in the noise level created by the loom." He also testified that Draper's developmental noise reduction kits, to which Dr. Bailey had referred, had been installed on a trial basis by one textile manufacturer and been found unsatisfactory. West Point's director of engineering provided testimony about the practical difficulties West Point had encountered in its attempts to implement various noise attenuation devices. Although he voiced his general skepticism that any noise reduction techniques currently known or proposed would prove to be practicable, he testified that West Point had ordered 24 of Draper's latest developmental loom modification kits. The third witness offered by West Point possessed a degree in electrical engineering, had worked primarily in the field of acoustics, and was accepted by the ALJ as an expert witness on the design of noise reduction modifications for space and machinery. This witness testified at length on the doubtful prospects for significantly reducing loom noise at West Point's Lindale mill, based on his personal investigation of the plant. He also stated that to the best of his knowledge there was no feasible engineering method available to reduce loom noises to 90 dBA or below.
The standard by which "substantial evidence" is measured "such relevant evidence as a reasonable mind might accept as adequate to support a conclusion" is clearly satisfied in this case. We accordingly affirm the Review Commission's decision that no Feasible technological methods for significantly reducing loom noise in West Point's weave rooms were in existence in 1974.
If, and when, through various technological developments, such methods do become feasible, West Point is obligated by § 1910.95(b)(1) to implement them. West Point is of course, by virtue of its extensive operations and prominent position in the textile industry, a part of the technology and must therefore exploit all reasonable opportunities, whether suggested by its own experience or that of others knowledgeable in the field, for solving this problem in a feasible manner. In the meantime, a feasible technological solution apparently, and unfortunately, exists only in the realm of theory.
AFFIRMED.