49 CFR · Transportation
§ 210.31 — Operation standards (stationary locomotives at 30 meters).
49 CFR § 210.31
TitleTitle 49: TransportationPartPart 210: Railroad Noise Emission Compliance Regulations
SourceeCFR (current through Apr 10, 2026)
This text of 49 C.F.R. § 210.31 (Operation standards (stationary locomotives at 30 meters).) is published on Counsel Stack Legal Research, covering United States primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.
Bluebook
49 C.F.R. § 210.31 (2026).
Text
§ 210.31 Operation standards (stationary locomotives at 30 meters).
(a)For stationary locomotives at load cells:
(1)Each noise emission test shall begin after the engine of the locomotive has attained the normal cooling water operating temperature as prescribed by the locomotive manufacturer.
(2)Noise emission testing in idle or maximum throttle setting shall start after a 40 second stabilization period in the throttle setting selected for the test.
(3)After the stabilization period as prescribed in paragraph (a)(2) of this section, the A-weighted sound level reading in decibels shall be observed for an additional 30-second period in the throttle setting selected for the test.
(4)The maximum A-weighted sound level reading in decibels that is observed during the 30-second period of
Free access — add to your briefcase to read the full text and ask questions with AI
Related
Nippon Yusen Kaisha v. Burlington & Northern Santa Fe Railway Co.
367 F. Supp. 2d 1292 (C.D. California, 2005)
Nearby Sections
7
Cite This Page — Counsel Stack
Bluebook (online)
49 C.F.R. § 210.31, Counsel Stack Legal Research, https://law.counselstack.com/cfr/49/210/210.31.