§ 215.404-71-2 — Performance risk.

eCFR · current through Aug 7, 2026

215.404-71-2 Performance risk.

(a)Description. This profit factor addresses the contractor's degree of risk in fulfilling the contract requirements. The factor consists of two parts:
(1)Technical—the technical uncertainties of performance.
(2)Management/cost control—the degree of management effort necessary—
(i)To ensure that contract requirements are met; and
(ii)To reduce and control costs.
(b)Determination. The following extract from the DD Form 1547 is annotated to describe the process. Item Contractor risk factors Assigned weighting Assigned value Base (item 20) Profit objective 21 Technical
(1)
(2)N/A N/A 22 Management/Cost Control
(1)
(2)N/A N/A 23 Performance Risk (Composite) N/A
(3)
(4)
(5)
(1)Assign a weight (percentage) to each element according to its input t

Free access — add to your briefcase to read the full text and ask questions with AI

48 C.F.R. § 215.404-71-2 (Performance risk.) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.