Canal or canal lining

Current through Pub. L. 119-102
Title 43Public Lands·Ch. 32A — COLORADO RIVER BASIN SALINITY CONTROL·Subch. I
(a)Authorization of construction To assist in meeting salinity control objectives of Minute No. 242 during an interim period, the Secretary is authorized to construct a new concrete-lined canal or, to line the presently unlined portion of the Coachella Canal of the Boulder Canyon project, California, from station 2 plus 26 to the beginning of siphon numbered 7, a length of approximately forty-nine miles. The United States shall be entitled to temporary use of a quantity of water, for the purpose of meeting the salinity control objectives of Minute No. 242, during an interim period, equal to the quantity of water conserved by constructing or lining the said canal. The interim period shall commence on completion of construction or lining said canal and shall end the first year that the Secr

Free access — add to your briefcase to read the full text and ask questions with AI

43 U.S.C. § 1572 (Canal or canal lining) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

§ 617d
43 U.S.C. § 617d
§ 25
43 U.S.C. § 25
§ 26
43 U.S.C. § 26
§ 27
43 U.S.C. § 27

Source Credit

History

(Pub. L. 93–320, title I, §102, June 24, 1974, 88 Stat. 268.)