FEDERAL · 42 U.S.C. · Chapter 85
Permit requirements and conditions
Current through Pub. L. 119-102
(a)Conditions
Each permit issued under this subchapter shall include enforceable emission limitations and standards, a schedule of compliance, a requirement that the permittee submit to the permitting authority, no less often than every 6 months, the results of any required monitoring, and such other conditions as are necessary to assure compliance with applicable requirements of this chapter, including the requirements of the applicable implementation plan.
(b)Monitoring and analysis
The Administrator may by rule prescribe procedures and methods for determining compliance and for monitoring and analysis of pollutants regulated under this chapter, but continuous emissions monitoring need not be required if alternative methods are available that provide sufficiently reliable and timely in
Free access — add to your briefcase to read the full text and ask questions with AI
42 U.S.C. § 7661c (Permit requirements and conditions) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.
Related
Romoland School District v. Inland Empire Energy Center, LLC
548 F.3d 738 (Ninth Circuit, 2008)
United States Sugar Corp. v. Environmental Protection Agency
830 F.3d 579 (D.C. Circuit, 2016)
The Sierra Club v. Stephen L. Johnson
436 F.3d 1269 (Eleventh Circuit, 2006)
Citizens Against Ruining the Environment v. Environmental Protection Agency
535 F.3d 670 (Seventh Circuit, 2008)
Sierra Club v. Otter Tail Power Co.
615 F.3d 1008 (Eighth Circuit, 2010)
White Stallion Energy Center, LLC v. Environmental Protection Agency
748 F.3d 1222 (D.C. Circuit, 2014)
United States v. EME Homer City Generation, L.P
727 F.3d 274 (Third Circuit, 2013)
Sierra Club v. Environmental Protection Agency
536 F.3d 673 (D.C. Circuit, 2008)
United States v. Duke Energy Corporation
278 F. Supp. 2d 619 (M.D. North Carolina, 2003)
Sierra Club v. Johnson
541 F.3d 1257 (Eleventh Circuit, 2008)
Sierra Club v. EPA
964 F.3d 882 (Tenth Circuit, 2020)
MacClarence v. United States Environmental Protection Agency
596 F.3d 1123 (Ninth Circuit, 2010)
Sierra Club v. United States Environmental Protection Agency
557 F.3d 401 (Sixth Circuit, 2009)
The Sierra Club v. U.S. EPA
368 F.3d 1300 (Eleventh Circuit, 2004)
Env Integrity Proj v. EPA
425 F.3d 992 (D.C. Circuit, 2005)
Sierra Club v. Portland General Electric Co.
663 F. Supp. 2d 983 (D. Oregon, 2009)
Erie Ins. Exchange v. Imperial Marble Corp.
957 N.E.2d 1214 (Appellate Court of Illinois, 2011)
Environmental Integrity Proj v. EPA
969 F.3d 529 (Fifth Circuit, 2020)
Sierra Club v. Otter Tail Corp.
608 F. Supp. 2d 1120 (D. South Dakota, 2009)
United States v. Cemex, Inc.
864 F. Supp. 2d 1040 (D. Colorado, 2012)
Source Credit
History
(July 14, 1955, ch. 360, title V, §504, as added Pub. L. 101–549, title V, §501, Nov. 15, 1990, 104 Stat. 2642.)