FEDERAL · 33 U.S.C. · Chapter 15
Fuse-plug levees
Current through Pub. L. 119-102
After the Eudora Floodway shall have been constructed and is ready for operation, the fuse-plug levees now at the head of the Boeuf and Tensas Basins shall be constructed to the 1914 grade and the 1928 section. The fuse-plug levees at the head of the Atchafalaya Basin on the west side shall be constructed to the 1914 grade and the 1928 section. The fuse-plug levees at the head of the Atchafalaya Basin on the east side of the Atchafalaya River shall be constructed to the 1914 grade and 1928 section, and, after the Morganza Floodway has been completed, shall be raised to the 1928 grade as provided in section 702a–3 of this title. Thereafter those stretches of said levees which are left as fuse-plug levees shall be reconstructed and maintained as herein provided, subject to the provisions of
Free access — add to your briefcase to read the full text and ask questions with AI
33 U.S.C. § 702a–4 (Fuse-plug levees) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.
Related
Source Credit
History
(June 15, 1936, ch. 548, §10, 49 Stat. 1511.)
Editorial Notes
Editorial Notes
References in Text
Herein, referred to in text, means act June 15, 1936, ch. 548, 49 Stat. 1508, which enacted sections 642a, 702a–1, 702a–2 to 702a–12, 702g–1, 702j–1, 702j–2, 702k–1, and 702k–2 of this title. For complete classification of this Act to the Code, see Tables.
References in Text
Herein, referred to in text, means act June 15, 1936, ch. 548, 49 Stat. 1508, which enacted sections 642a, 702a–1, 702a–2 to 702a–12, 702g–1, 702j–1, 702j–2, 702k–1, and 702k–2 of this title. For complete classification of this Act to the Code, see Tables.