Contracts for project; guaranty of cost

Current through Pub. L. 119-102
Title 33Navigation and Navigable Waters·Ch. 11 — BRIDGES OVER NAVIGABLE WATERS·Subch. II
After approval of such general plans and specifications by the Secretary, and after notification of such approval, the bridge owner shall, in such manner and within such times as the Secretary may prescribe, take bids for the alteration of such bridge in accordance with such general plans and specifications. All bids, including any bid for all or part of the project submitted by the bridge owner, shall be submitted to the Secretary, together with a recommendation by the bridge owner as to the most competent bid or bids, and at the same time the bridge owner shall submit to the Secretary a written guaranty that the total cost of the project, including the cost of such work as is to be performed by the bridge owner and not included in the work to be performed by contract, shall not exceed th

Free access — add to your briefcase to read the full text and ask questions with AI

33 U.S.C. § 515 (Contracts for project; guaranty of cost) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

§ 516
33 U.S.C. § 516

Source Credit

History

(June 21, 1940, ch. 409, §5, 54 Stat. 498; Pub. L. 85–640, §1(a), (b), Aug. 14, 1958, 72 Stat. 595.)

Editorial Notes

Editorial Notes

Amendments
1958—Pub. L. 85–640 struck out provisions which required bridge owner to take bids within 90 days after notification of approval of general plans and specifications, and inserted provisions permitting the taking of partial bids where funds have been appropriated for part of a project, and requiring the bridge owner, if requested, to submit a revised guaranty of cost.