FEDERAL · 30 U.S.C. · Chapter 22

Underground high-voltage distribution

Current through Pub. L. 119-102
Title 30Mineral Lands and Mining·Ch. 22 — MINE SAFETY AND HEALTH·Subch. III
(a)Circuits entering underground areas of mines; circuit breakers High-voltage circuits entering the underground area of any coal mine shall be protected by suitable circuit breakers of adequate interrupting capacity which are properly tested and maintained as prescribed by the Secretary. Such breakers shall be equipped with devices to provide protection against under-voltage, grounded phase, short circuit, and overcurrent.
(b)Circuits extending underground and supplying equipment; direct neutral grounds; ground conductors for frames, exceptions; location of disconnection devices, exceptions High-voltage circuits extending underground and supplying portable, mobile, or stationary high-voltage equipment shall contain either a direct or derived neutral which shall be grounded through a sui

Free access — add to your briefcase to read the full text and ask questions with AI

30 U.S.C. § 868 (Underground high-voltage distribution) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

United States v. Kyle Jones, United States of America v. Gary Neil
735 F.2d 785 (Fourth Circuit, 1984)
155 case citations
National Mining Ass'n v. Secretary of Labor
763 F.3d 627 (Sixth Circuit, 2014)
4 case citations

Source Credit

History

(Pub. L. 91–173, title III, §308, Dec. 30, 1969, 83 Stat. 780.)

Editorial Notes

Editorial Notes

References in Text
For the operative date of this subchapter, referred to in subsec. (d), see section 509 of Pub. L. 91–173, set out as an Effective Date note under section 801 of this title.

Statutory Notes and Related Subsidiaries

Effective Date
Section operative 90 days after Dec. 30, 1969, except to the extent an earlier date is specifically provided for in Pub. L. 91–173, see section 509 of Pub. L. 91–173, set out as a note under section 801 of this title.