FEDERAL · 16 U.S.C. · Chapter 2

Loop trail study; authorization

Current through Pub. L. 119-102
Title 16Conservation·Ch. 2 — NATIONAL FORESTS·Subch. I
(a)Study Not later than three years after funds are first made available for this purpose, the Secretary, in consultation with interested parties, shall complete a study of the suitability and feasibility of establishing, consistent with the purpose set forth in section 539l(a)(2) of this title, a loop trail for mechanized and other nonmotorized recreation connecting the trail designated as "Rogers Pass" and the trail designated as "Rollins Pass Road".
(b)Establishment If the results of the study required by subsection (a) indicate that establishment of such a loop trail would be suitable and feasible, consistent with the purpose set forth in section 539l(a)(2) of this title, the Secretary shall establish the loop trail in a manner consistent with that purpose.

Free access — add to your briefcase to read the full text and ask questions with AI

16 U.S.C. § 539l–3 (Loop trail study; authorization) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

§ 539l
16 U.S.C. § 539l

Source Credit

History

(Pub. L. 107–216, §6, Aug. 21, 2002, 116 Stat. 1060.)