FEDERAL · 10 U.S.C. · Chapter 863
Ford-class aircraft carriers: cost limitation baselines
Current through Pub. L. 119-102
(a)Limitation.—The total amounts obligated or expended from funds authorized to be appropriated or otherwise made available for Shipbuilding and Conversion, Navy, or for any other procurement account, may not exceed the following amounts for the following aircraft carriers:
(1)$13,224,000,000 for the construction of the aircraft carrier designated CVN–78.
(2)$11,398,000,000 for the construction of the aircraft carrier designated CVN–79.
(3)$12,202,000,000 for the construction of the aircraft carrier designated CVN–80.
(4)$12,451,000,000 for the construction of the aircraft carrier designated CVN–81.
(b)Exclusion of Battle and Interim Spares From Cost Limitation.—The Secretary of the Navy shall exclude from the determination of the amounts set forth in subsection (a) the costs of the
Free access — add to your briefcase to read the full text and ask questions with AI
10 U.S.C. § 8692 (Ford-class aircraft carriers: cost limitation baselines) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.
Source Credit
History
(Added Pub. L. 116–92, div. A, title I, §121(a), Dec. 20, 2019, 133 Stat. 1233.)
Editorial Notes
Editorial Notes
Codification
Another section 8692 was renumbered section 8693 of this title.
Prior Provisions
A prior section 8692, act Aug. 10, 1956, ch. 1041, 70A Stat. 538, provided qualifications to receive a rating of pilot in time of peace, prior to repeal by Pub. L. 92–168, §3(1), Nov. 24, 1971, 85 Stat. 489. See section 2003 of this title.
Codification
Another section 8692 was renumbered section 8693 of this title.
Prior Provisions
A prior section 8692, act Aug. 10, 1956, ch. 1041, 70A Stat. 538, provided qualifications to receive a rating of pilot in time of peace, prior to repeal by Pub. L. 92–168, §3(1), Nov. 24, 1971, 85 Stat. 489. See section 2003 of this title.