FEDERAL · 10 U.S.C. · Chapter 607
Life-cycle cost estimates of certain atomic energy defense capital assets
Current through Pub. L. 119-102
(a)In General.—The Secretary of Energy shall ensure that an independent life-cycle cost estimate under Department of Energy Order 413.3B (relating to program management and project management for the acquisition of capital assets), or a successor order, of each capital asset described in subsection (b) is conducted before the asset achieves critical decision 2 in the acquisition process.
(b)Capital Assets Described.—A capital asset described in this subsection is an atomic energy defense capital asset—
(1)the total project cost of which exceeds $100,000,000; and
(2)the purpose of which is to perform a limited-life, single-purpose mission.
(c)Independent Defined.—For purposes of subsection (a), the term "independent", with respect to a life-cycle cost estimate of a capital asset, means
Free access — add to your briefcase to read the full text and ask questions with AI
10 U.S.C. § 6285 (Life-cycle cost estimates of certain atomic energy defense capital assets) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.
Source Credit
History
(Added Pub. L. 119–60, div. C, title XXXI, §3111(a), Dec. 18, 2025, 139 Stat. 1434.)
Editorial Notes
Editorial Notes
Prior Provisions
Provisions similar to those in this section were contained in section 2754 of Title 50, War and National Defense, prior to repeal by Pub. L. 119–60, §3111(b)(1).
Prior Provisions
Provisions similar to those in this section were contained in section 2754 of Title 50, War and National Defense, prior to repeal by Pub. L. 119–60, §3111(b)(1).