FEDERAL · 10 U.S.C. · Chapter 551
Acquisition accountability on the missile defense system
Current through Pub. L. 119-102
(a)Baselines Required.—
(1)In accordance with paragraph (2), the Director of the Missile Defense Agency shall establish and maintain an acquisition baseline for—
(A)each program element of the missile defense system, as specified in section 223 1 of this title; and
(B)each designated major subprogram of such program elements.
(2)The Director shall establish an acquisition baseline required by paragraph (1) before the date on which the program element or major subprogram enters—
(A)engineering and manufacturing development (or its equivalent); and
(B)production and deployment.
(3)Except as provided by subsection (c), the Director may not adjust or revise an acquisition baseline established under this section.
(b)Elements of Baselines.—Each acquisition baseline required by subsection
Free access — add to your briefcase to read the full text and ask questions with AI
10 U.S.C. § 5514 (Acquisition accountability on the missile defense system) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.
Related
§ 223
10 U.S.C. § 223
Source Credit
History
(Added Pub. L. 118–159, div. A, title XVI, §1649(a), Dec. 23, 2024, 138 Stat. 2191; amended Pub. L. 119–60, div. A, title XVIII, §1811(g)(5), Dec. 18, 2025, 139 Stat. 1243.)
Editorial Notes
Editorial Notes
References in Text
Section 223 of this title, referred to in subsec. (a)(1)(A), was repealed by Pub. L. 118–159, div. A, title XVI, §1649(b)(1), Dec. 23, 2024, 138 Stat. 2199. See section 5511 of this title.
Prior Provisions
Provisions similar to those in this section were contained in section 225 of this title prior to repeal by Pub. L. 118–159, div. A, title XVI, §1649(b)(1), Dec. 23, 2024, 138 Stat. 2199.
Amendments
2025—Subsec. (b)(2)(C)(ii). Pub. L. 119–60 substituted "reviewed" for "approved".
Statutory Notes and Related Subsidiaries
Improvement to Operations and Sustainment Cost Estimates
Pub. L. 113–66, div. A, title II, §231(a), Dec. 26, 2013, 127 Stat. 710, provided that: "In preparing the acquisition accountability reports on the ballistic missile defense system required by [former] section 225 of title 10, United States Code, the Director of the Missile Defense Agency shall improve the quality of cost estimates relating to operations and sustainment that are included in such reports under subsection (b)(3)(A) of such section, including with respect to the confidence levels of such cost estimates."
References in Text
Section 223 of this title, referred to in subsec. (a)(1)(A), was repealed by Pub. L. 118–159, div. A, title XVI, §1649(b)(1), Dec. 23, 2024, 138 Stat. 2199. See section 5511 of this title.
Prior Provisions
Provisions similar to those in this section were contained in section 225 of this title prior to repeal by Pub. L. 118–159, div. A, title XVI, §1649(b)(1), Dec. 23, 2024, 138 Stat. 2199.
Amendments
2025—Subsec. (b)(2)(C)(ii). Pub. L. 119–60 substituted "reviewed" for "approved".
Statutory Notes and Related Subsidiaries
Improvement to Operations and Sustainment Cost Estimates
Pub. L. 113–66, div. A, title II, §231(a), Dec. 26, 2013, 127 Stat. 710, provided that: "In preparing the acquisition accountability reports on the ballistic missile defense system required by [former] section 225 of title 10, United States Code, the Director of the Missile Defense Agency shall improve the quality of cost estimates relating to operations and sustainment that are included in such reports under subsection (b)(3)(A) of such section, including with respect to the confidence levels of such cost estimates."