FEDERAL · 10 U.S.C. · Chapter SUBCHAPTER I—MILITARY CONSTRUCTION
Stormwater management, shoreline erosion control, and water resilience projects for installations and defense access roads
10 U.S.C. § 2815a
Title10 — Armed Forces
ChapterSUBCHAPTER I—MILITARY CONSTRUCTION
This text of 10 U.S.C. § 2815a (Stormwater management, shoreline erosion control, and water resilience projects for installations and defense access roads) is published on Counsel Stack Legal Research, covering United States primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.
Bluebook
10 U.S.C. § 2815a.
Text
(a)Projects Authorized.—The Secretary concerned may carry out one or more of the following projects on or related to a military installation:
(1)A stormwater management project for the purposes of—
(A)improving military installation resilience or the resilience of a defense access road or other essential civilian infrastructure supporting a military installation; and
(B)protecting nearby waterways and stormwater-stressed ecosystems.
(2)A shoreline erosion control project for the purpose of improving, protecting, or repairing shoreline to protect the infrastructure of a military installation or a defense access road.
(3)A project to provide water storage and filtration, flood mitigation, or otherwise support water resilience.
(b)Project Methods and Funding Sources.—Using such amounts
Free access — add to your briefcase to read the full text and ask questions with AI
Related
Source Credit
History
(Added Pub. L. 117–81, div. B, title XXVIII, §2803, Dec. 27, 2021, 135 Stat. 2186; amended Pub. L. 118–159, div. B, title XXVIII, §2847, Dec. 23, 2024, 138 Stat. 2264.)
Editorial Notes
Editorial Notes
Amendments
2024—Pub. L. 118–159, §2847(a)(1), amended section catchline generally. Prior to amendment, catchline read as follows: "Stormwater management projects for installation and defense access road resilience and waterway and ecosystems conservation".
Subsec. (a). Pub. L. 118–159, §2847(a)(2), amended subsec. (a) generally. Prior to amendment, text read as follows: "The Secretary concerned may carry out a stormwater management project on or related to a military installation for the purpose of—
"(1) improving military installation resilience or the resilience of a defense access road or other essential civilian infrastructure supporting the military installation; and
"(2) protecting nearby waterways and stormwater-stressed ecosystems."
Subsec. (b). Pub. L. 118–159, §2847(a)(3)(A), struck out "stormwater management" before "project under this section" in introductory provisions.
Subsec. (b)(5) to (8). Pub. L. 118–159, §2847(a)(3)(B), (C), added par.(5) and redesignated former pars. (5) to (7) as (6) to (8), respectively.
Subsec. (c). Pub. L. 118–159, §2847(a)(4), amended subsec. (c) generally. Prior to amendment, text read as follows: "In selecting stormwater management projects to be carried out under this section, the Secretary concerned shall give a priority to project proposals involving the retrofitting of buildings and grounds on a military installation or retrofitting a defense access road to reduce stormwater runoff and ponding or standing water that includes the combination of stormwater runoff and water levels resulting from extreme weather conditions."
Subsec. (d). Pub. L. 118–159, §2847(a)(5)(A), struck out "stormwater management" before "project" in introductory provisions.
Subsec. (d)(1). Pub. L. 118–159, §2847(a)(5)(B), substituted ", retention, or filtration measures to address storm water management" for "and retention measures".
Subsec. (d)(4), (5). Pub. L. 118–159, §2847(a)(5)(C), added pars. (4) and (5).
Subsec. (e). Pub. L. 118–159, §2847(a)(6), designated existing provisions as par. (1), struck out "stormwater management" before "project carried", substituted "section 2391, 2684," for "section 2391(d),", and added par. (2).
Subsec. (f)(1)(A). Pub. L. 118–159, §2847(a)(7)(A), struck out "stormwater management" before "projects".
Subsec. (f)(2). Pub. L. 118–159, §2847(a)(7)(A), struck out "stormwater management" before "project" in introductory provisions.
Subsec. (f)(2)(B)(iii), (iv). Pub. L. 118–159, §2847(a)(7)(B), added cls. (iii) and (iv).
Subsec. (g)(4). Pub. L. 118–159, §2847(b), substituted "section 101" for "section 101(e)(8)".
Subsec. (g)(6). Pub. L. 118–159, §2847(a)(8), added par. (6).
Amendments
2024—Pub. L. 118–159, §2847(a)(1), amended section catchline generally. Prior to amendment, catchline read as follows: "Stormwater management projects for installation and defense access road resilience and waterway and ecosystems conservation".
Subsec. (a). Pub. L. 118–159, §2847(a)(2), amended subsec. (a) generally. Prior to amendment, text read as follows: "The Secretary concerned may carry out a stormwater management project on or related to a military installation for the purpose of—
"(1) improving military installation resilience or the resilience of a defense access road or other essential civilian infrastructure supporting the military installation; and
"(2) protecting nearby waterways and stormwater-stressed ecosystems."
Subsec. (b). Pub. L. 118–159, §2847(a)(3)(A), struck out "stormwater management" before "project under this section" in introductory provisions.
Subsec. (b)(5) to (8). Pub. L. 118–159, §2847(a)(3)(B), (C), added par.(5) and redesignated former pars. (5) to (7) as (6) to (8), respectively.
Subsec. (c). Pub. L. 118–159, §2847(a)(4), amended subsec. (c) generally. Prior to amendment, text read as follows: "In selecting stormwater management projects to be carried out under this section, the Secretary concerned shall give a priority to project proposals involving the retrofitting of buildings and grounds on a military installation or retrofitting a defense access road to reduce stormwater runoff and ponding or standing water that includes the combination of stormwater runoff and water levels resulting from extreme weather conditions."
Subsec. (d). Pub. L. 118–159, §2847(a)(5)(A), struck out "stormwater management" before "project" in introductory provisions.
Subsec. (d)(1). Pub. L. 118–159, §2847(a)(5)(B), substituted ", retention, or filtration measures to address storm water management" for "and retention measures".
Subsec. (d)(4), (5). Pub. L. 118–159, §2847(a)(5)(C), added pars. (4) and (5).
Subsec. (e). Pub. L. 118–159, §2847(a)(6), designated existing provisions as par. (1), struck out "stormwater management" before "project carried", substituted "section 2391, 2684," for "section 2391(d),", and added par. (2).
Subsec. (f)(1)(A). Pub. L. 118–159, §2847(a)(7)(A), struck out "stormwater management" before "projects".
Subsec. (f)(2). Pub. L. 118–159, §2847(a)(7)(A), struck out "stormwater management" before "project" in introductory provisions.
Subsec. (f)(2)(B)(iii), (iv). Pub. L. 118–159, §2847(a)(7)(B), added cls. (iii) and (iv).
Subsec. (g)(4). Pub. L. 118–159, §2847(b), substituted "section 101" for "section 101(e)(8)".
Subsec. (g)(6). Pub. L. 118–159, §2847(a)(8), added par. (6).
Cite This Page — Counsel Stack
Bluebook (online)
10 U.S.C. § 2815a, Counsel Stack Legal Research, https://law.counselstack.com/usc/10/2815a.