§ 37-16-104 — Safety and performance requirements
(a)A net metering system used by a customer-generator
shall meet all applicable safety and performance standards
established by the national electrical code, the institute of
electrical and electronics engineers and underwriters
laboratories.
(b)The customer-generator shall at its expense provide
lockable, switching equipment capable of isolating the net
metering facility from the electric utility's system. Such
equipment shall be approved by the electric utility and shall be
accessible by the electric utility at all times.
(c)The electric utility shall not be liable directly or
indirectly for permitting or continuing to allow an attachment
of a net metering facility, or for acts or omissions of the
customer-generator that cause loss or injury, including death,
to any third party.
(d)T
Free access — add to your briefcase to read the full text and ask questions with AI
Wyoming § 37-16-104 (Safety and performance requirements) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.
Nearby Sections
6
§ 37-1-101
37-16-102. Electric utility requirements§ 37-16-101
Definitions§ 37-16-103
Calculation requirements§ 37-16-104
Safety and performance requirements§ 37-16-201
Definitions§ 37-16-202
Tariffs for outdoor lighting