West Virginia Statutes
§ 22-6B-2 — Definitions
West Virginia·Ch. 22 ENVIRONMENTAL RESOURCES·Art. 6B OIL AND GAS HORIZONTAL WELL PRODUCTION DAMAGE COMPENSATION
In this article:
(1)"Drilling operations" means the actual drilling or redrilling of a horizontal well commenced subsequent to the effective date of this article, and the related preparation of the drilling site and access road, which requires entry, upon the surface estate;
(2)"Horizontal drilling" means a method of drilling a well for the production of natural gas that is intended to maximize the length of wellbore that is exposed to the formation and in which the wellbore is initially vertical but is eventually curved to become horizontal, or nearly horizontal, to parallel a particular geologic formation;
(3)"Horizontal well" means any well site, other than a coalbed methane well, drilled using a horizontal drilling method, and which disturbs three acres or more of surface, exclud
Free access — add to your briefcase to read the full text and ask questions with AI
West Virginia § 22-6B-2 (Definitions) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.
Nearby Sections
15
§ 22-1-11
Saving provisions§ 22-1-12
Public information§ 22-1-13
Notification of permitting decisions§ 22-1-16
Time for commencing proceedings§ 22-1-2
Definitions§ 22-1-5
Jurisdiction vested in division