West Virginia Statutes

§ 22-6-30 — Reclamation requirements

West Virginia·Ch. 22 ENVIRONMENTAL RESOURCES·Art. 6 OFFICE OF OIL AND GAS; OIL AND GAS WELLS; ADMINISTRATION; ENFORCEMENT

The operator of a well shall reclaim the land surface within the area disturbed in siting, drilling, completing or producing the well in accordance with the following requirements:

(a)Within six months after the completion of the drilling process, the operator shall fill all the pits for containing muds, cuttings, salt water and oil that are not needed for production purposes, or are not required or allowed by state or federal law or rule and remove all concrete bases, drilling supplies and drilling equipment. Within such period, the operator shall grade or terrace and plant, seed or sod the area disturbed that is not required in production of the well where necessary to bind the soil and prevent substantial erosion and sedimentation. No pit may be used for the ultimate disposal of salt

Free access — add to your briefcase to read the full text and ask questions with AI

West Virginia § 22-6-30 (Reclamation requirements) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Legislative History

1994 Reg. Sess., HB4065

Nearby Sections

15
View on official source ↗