Washington Statutes
§ 70.79.290 — Inspection certificate—Contents—Posting—Fee.
Washington § 70.79.290
This text of Washington § 70.79.290 (Inspection certificate—Contents—Posting—Fee.) is published on Counsel Stack Legal Research, covering Washington primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.
Bluebook
Wash. Rev. Code § 70.79.290 (2026).
Text
If, upon inspection, a boiler or pressure vessel is found to comply with the rules and regulations of the board, and upon the appropriate fee payment made directly to the chief inspector, as required by RCW 70.79.160 or 70.79.330 , the chief inspector shall issue to the owner or user of such a boiler or pressure vessel an inspection certificate bearing the date of inspection and specifying the maximum pressure under which the boiler or pressure vessel may be operated. Such inspection certificate shall be valid for not more than fourteen months from its date in the case of power boilers and twenty-six months in the case of low pressure heating boilers, and for not more than two months longer than the authorized inspection period in the case of pressure vessels. Certificates shall be posted
Free access — add to your briefcase to read the full text and ask questions with AI
Related
§ 70.79.160
Washington § 70.79.160
Legislative History
[1977 ex.s. c 175 s 1;1970 ex.s. c 21 s 1;1951 c 32 s 28.]
Nearby Sections
15
§ 70.01.030
Health care fees and charges—Estimate.§ 70.01.040
Provider-based clinics that charge a facility fee—Posting of required notice—Reporting requirements.§ 70.02.005
Findings.§ 70.02.010
Definitions.(Effective until June 30, 2027.)§ 70.02.020
Disclosure by health care provider.§ 70.02.045
Third-party payor release of information.§ 70.02.060
Discovery request or compulsory process.Cite This Page — Counsel Stack
Bluebook (online)
Washington § 70.79.290, Counsel Stack Legal Research, https://law.counselstack.com/statute/wa/70.79.290.