§ 70.79.250 — Inspection—Frequency—Grace period.

Washington § 70.79.250
JurisdictionWashington
Title 70PUBLIC HEALTH AND SAFETY
Ch. 70.79BOILERS AND UNFIRED PRESSURE VESSELS

This text of Washington § 70.79.250 (Inspection—Frequency—Grace period.) is published on Counsel Stack Legal Research, covering Washington primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Wash. Rev. Code § 70.79.250 (2026).

Text

In the case of power boilers a grace period of not more than two months longer than the period established by the board under RCW 70.79.240 (1) may elapse between internal inspections of a boiler while not under pressure or between external inspections of a boiler while under pressure; in the case of low pressure heating boilers not more than twenty-six months shall elapse between inspections, and in the case of unfired pressure vessels not more than two months longer than the period between inspections prescribed by the board shall elapse between internal inspections.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

§ 70.79.240
Washington § 70.79.240

Legislative History

[1993 c 391 s 2;1951 c 32 s 23.]