Washington Statutes

§ 70.79.060 — Construction, installation must conform to rules—Inspection certificate.

Washington § 70.79.060
JurisdictionWashington
Title 70PUBLIC HEALTH AND SAFETY
Ch. 70.79BOILERS AND UNFIRED PRESSURE VESSELS

This text of Washington § 70.79.060 (Construction, installation must conform to rules—Inspection certificate.) is published on Counsel Stack Legal Research, covering Washington primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Wash. Rev. Code § 70.79.060 (2026).

Text

(1)Except as provided in subsection (2) of this section, no power boiler, low pressure boiler, or unfired pressure vessel which does not conform to the rules and regulations formulated by the board governing new construction and installation shall be installed and operated in this state after twelve months from the date upon which the first rules and regulations under this chapter pertaining to new construction and installation shall have become effective, unless the boiler or unfired pressure vessel is of special design or construction, and is not covered by the rules and regulations, nor is in any way inconsistent with such rules and regulations, in which case an inspection certificate may at its discretion be granted by the board.
(2)An inspection certificate may also be granted for

Free access — add to your briefcase to read the full text and ask questions with AI

Legislative History

[2009 c 90 s 1;1984 c 93 s 1;1951 c 32 s 6.]

Nearby Sections

15
View on official source ↗

Cite This Page — Counsel Stack

Bluebook (online)
Washington § 70.79.060, Counsel Stack Legal Research, https://law.counselstack.com/statute/wa/70.79.060.