Washington Statutes
§ 70.79.060 — Construction, installation must conform to rules—Inspection certificate.
Washington § 70.79.060
This text of Washington § 70.79.060 (Construction, installation must conform to rules—Inspection certificate.) is published on Counsel Stack Legal Research, covering Washington primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.
Bluebook
Wash. Rev. Code § 70.79.060 (2026).
Text
(1)Except as provided in subsection (2) of this section, no power boiler, low pressure boiler, or unfired pressure vessel which does not conform to the rules and regulations formulated by the board governing new construction and installation shall be installed and operated in this state after twelve months from the date upon which the first rules and regulations under this chapter pertaining to new construction and installation shall have become effective, unless the boiler or unfired pressure vessel is of special design or construction, and is not covered by the rules and regulations, nor is in any way inconsistent with such rules and regulations, in which case an inspection certificate may at its discretion be granted by the board.
(2)An inspection certificate may also be granted for
Free access — add to your briefcase to read the full text and ask questions with AI
Legislative History
[2009 c 90 s 1;1984 c 93 s 1;1951 c 32 s 6.]
Nearby Sections
15
§ 70.01.030
Health care fees and charges—Estimate.§ 70.01.040
Provider-based clinics that charge a facility fee—Posting of required notice—Reporting requirements.§ 70.02.005
Findings.§ 70.02.010
Definitions.(Effective until June 30, 2027.)§ 70.02.020
Disclosure by health care provider.§ 70.02.045
Third-party payor release of information.§ 70.02.060
Discovery request or compulsory process.Cite This Page — Counsel Stack
Bluebook (online)
Washington § 70.79.060, Counsel Stack Legal Research, https://law.counselstack.com/statute/wa/70.79.060.