Washington Statutes

§ 49.24.170 — Electric power requirements.

Washington § 49.24.170
JurisdictionWashington
Title 49LABOR REGULATIONS
Ch. 49.24HEALTH AND SAFETY—UNDERGROUND WORKERS

This text of Washington § 49.24.170 (Electric power requirements.) is published on Counsel Stack Legal Research, covering Washington primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Wash. Rev. Code § 49.24.170 (2026).

Text

When electric power is used for running compressors supplying air for compressed air tunnel work and such power is purchased from a local central station or power company —

(1)There shall be two or more sources of power from the power company's stations to the compressor plant. Such power feeders shall each have a capacity large enough to carry the entire compressor plant load and normal overload. The feeders shall preferably run from separate generating plants or substations and be carried to the compressor plant over separate routes and not through the same duct lines and manholes so that the breakdown of one feeder shall not cause an interruption on the other feeder.
(2)There shall be duplicate feeder bus-bars, and feeder connections to the bus-bars shall be such that either feeder

Free access — add to your briefcase to read the full text and ask questions with AI

Legislative History

[1941 c 194 s 10; Rem. Supp. 1941 s 7666-18.]

Nearby Sections

15
View on official source ↗

Cite This Page — Counsel Stack

Bluebook (online)
Washington § 49.24.170, Counsel Stack Legal Research, https://law.counselstack.com/statute/wa/49.24.170.