Washington Statutes

§ 39.35.040 — Facility design to include life-cycle cost analysis.

Washington § 39.35.040
JurisdictionWashington
Title 39PUBLIC CONTRACTS AND INDEBTEDNESS
Ch. 39.35ENERGY CONSERVATION IN DESIGN OF PUBLIC FACILITIES

This text of Washington § 39.35.040 (Facility design to include life-cycle cost analysis.) is published on Counsel Stack Legal Research, covering Washington primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Wash. Rev. Code § 39.35.040 (2026).

Text

Whenever a public agency determines that any major facility or a critical governmental facility is to be constructed or renovated, such agency shall cause to be included in the design phase of such construction or renovation a provision that requires a life-cycle cost analysis conforming with the guidelines developed in RCW 39.35.050 to be prepared for such facility. Such analysis shall be approved by the agency prior to the commencement of actual construction or renovation. A public agency may accept the facility design if the agency is satisfied that the life-cycle cost analysis provides for an efficient energy system or systems based on the economic life of the facility. Nothing in this section prohibits the construction or renovation of major facilities or critical governmental facili

Free access — add to your briefcase to read the full text and ask questions with AI

Related

§ 39.35.050
Washington § 39.35.050
§ 39.35.010
Washington § 39.35.010

Legislative History

[2015 3rd sp.s. c 19 s 5;1994 c 242 s 2;1982 c 159 s 4;1975 1st ex.s. c 177 s 4.]

Nearby Sections

15
View on official source ↗

Cite This Page — Counsel Stack

Bluebook (online)
Washington § 39.35.040, Counsel Stack Legal Research, https://law.counselstack.com/statute/wa/39.35.040.