§ 49-37-9 — Duty to cause estimates before entering into contract--Joint projects excepted--Minimum number of bids.

South Dakota § 49-37-9
JurisdictionSouth Dakota
Title 49PUBLIC UTILITIES AND CARRIERS
Ch. 49-36CONSUMERS POWER DISTRICT POWERS AND OPERATIONS

This text of South Dakota § 49-37-9 (Duty to cause estimates before entering into contract--Joint projects excepted--Minimum number of bids.) is published on Counsel Stack Legal Research, covering South Dakota primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
S.D. Codified Laws § 49-37-9 (2026).

Text

Before any consumers power district enters into any contract for the construction, building, alteration, extension, or improvement of any power plant or system, or any part or section thereof, for the use of the district, or for the purchase of any materials, machinery, or equipment, excluding the purchase of electric power and energy, the district shall cause estimates of the cost thereof to be made by a competent engineer. If the estimated cost exceeds the sum of fifty thousand dollars, no contract may be entered into without advertising for sealed bids. However, this section does not apply to any consumers power district if the district, jointly with others, contracts for construction, building, alteration, extension, improvement, or leasing of any power plant or system. As far as pract

Free access — add to your briefcase to read the full text and ask questions with AI

Legislative History

SL 1950 (SS), ch 17, § 52; SDC Supp 1960, § 52.1752; SL 1973, ch 286, § 3; SL 1975, ch 287; SL 1983, ch 344; SL 1989, ch 403, § 21.