South Dakota Statutes

§ 46A-14-48 — Determination of priority of specific projects--Surveys of work--Estimates--Reports of engineer, filing, public inspection.

South Dakota·Title 46A WATER MANAGEMENT·Ch. 46A-13 WATERSHED DISTRICTS

After the general improvement plan of the district has been adopted, as provided in § 46A-14-47 , the managers shall determine the order in which specific projects included in the general plan shall be undertaken and shall cause accurate surveys of all work deemed necessary to be done and accurate estimates and calculations to be made by the engineer, as provided in this chapter. The engineer shall make written reports showing the amount, character, and kind of work to be done and the location and estimated cost thereof. Any engineer's report shall include:

(1)A description of any area to be benefited by the project and each of the major works of improvement;
(2)The starting point, the route, and the terminus of any proposed drainage ditches or flood control canals;
(3)The cour

Free access — add to your briefcase to read the full text and ask questions with AI

South Dakota § 46A-14-48 (Determination of priority of specific projects--Surveys of work--Estimates--Reports of engineer, filing, public inspection.) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Legislative History

SL 1957, ch 492, § 22; SL 1959, ch 452, § 17; SDC Supp 1960, § 61.1522; SDCL, § 46-24-48; SL 1985, ch 364, § 1; SL 1995, ch 253, § 7.

Nearby Sections

15
View on official source ↗