South Dakota Statutes
§ 46A-10A-86 — Improvements--Survey and cost estimate--Ordering without notice.
If a board determines that improvements which differ from repairs are necessary or desirable, the board may appoint an engineer to conduct a survey of the proposed improvement, estimate its cost, and file the estimate with the board. An improvement may include enlarging, reopening, widening, deepening, strengthening, or lengthening of any drain; changing the location of or improving and enlarging an outlet for better service; converting all or a part of any drain from an open ditch to a closed drain; installing surface pipe for open ditches; leveling spoil banks; or constructing settling basins. If the estimated cost of the improvements does not exceed ten thousand dollars, the board may order the work done without notice.
Free access — add to your briefcase to read the full text and ask questions with AI
South Dakota § 46A-10A-86 (Improvements--Survey and cost estimate--Ordering without notice.) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.
Legislative History
SL 1985, ch 362, § 87.
Nearby Sections
15
§ 46A-1-1
Legislative findings and policy.§ 46A-1-100
Definition of terms.§ 46A-1-102
Disbursement and administration of money from subfunds--Rules--Application of provisions.§ 46A-1-103
Promulgation of rules by board--Content.§ 46A-1-13
Presentation of cost data to Governor and Legislature--Requests for financing authorization.§ 46A-1-13.10
Lewis and Clark Rural Water System authorized.§ 46A-1-13.11
Southern Black Hills Water System authorized.§ 46A-1-13.12
Belle Fourche irrigation upgrade project authorized.