South Dakota Statutes
§ 45-6D-9 — Reclamation plan--Contents.
The reclamation plan shall be based on provision for, or satisfactory explanation of, all general requirements for the type of reclamation proposed to be implemented by the operator. Reclamation is mandatory on all affected lands. The reclamation plan shall include the following:
(1)A description of the type of reclamation the operator proposes to achieve in the reclamation of the affected land;
(2)A proposed timetable for seeding and replanting indicating when and how the reclamation plan will be implemented. Such timetable shall be developed after consulting the local conservation district as to the nature of the soils and native vegetation in the area of the proposed exploration operation. The recommendations of the local conservation district shall be followed if any are provid
Free access — add to your briefcase to read the full text and ask questions with AI
South Dakota § 45-6D-9 (Reclamation plan--Contents.) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.
Legislative History
SL 1982, ch 307, § 9.