§ 39-26.6-3. Definitions.
When used in this chapter, the following terms shall have the following meanings:
(1) "Board� shall mean the distributed-generation board as established pursuant to the
provisions of § 39-26.2-10 under the title distributed generation standard contract board, but shall also fulfill
the responsibilities set forth in this chapter.
(2) "Ceiling price� means the bidding price cap(s) applicable to each annual enrollment
for a given distributed-generation class, that shall be approved for each renewable
energy class pursuant to the procedure established in this chapter. The ceiling price(s)
are not required to, but may be, approved for up to three years. The ceiling price
for each technology should be a price that would allow a private owner to invest in
a given project at a reasonable rate of return, based on recently reported and forecast
information on the cost of capital and the cost of generation equipment. The calculation
of the reasonable rate of return for a project shall include, where applicable, any
state or federal incentives, including, but not limited to, tax incentives. Nothing
shall prohibit the distributed-generation board from proposing revised ceiling prices
prior to a program year to account for changes to available federal or state tax incentives,
trade tariffs, or other federal or state incentives that would affect the calculation
of the rate of return on a project.
(3) "Commercial-scale solar project� means a solar distributed-generation project with
the nameplate capacity specified in § 39-26.6-7.
(4) "Commission� means the Rhode Island public utilities commission.
(5) "Community remote distributed-generation system� means a distributed-generation facility
greater than two hundred fifty kilowatt (250 KW) nameplate direct current that allocates
bill credits for each kilowatt hour (KWh) generated to a minimum of three (3), eligible
recipient-customer accounts, provided that no more than fifty percent (50%) of the
credits produced by the system are allocated to one eligible recipient-customer account,
and provided further that at least fifty percent (50%) of the credits produced by
the system are allocated to eligible recipients in an amount not to exceed that which
is produced annually by twenty-five kilowatt (25 KW) AC capacity. The community remote
distributed-generation system may transfer credits to eligible recipient-customer
accounts in an amount that is equal to, or less than, the sum of the usage of the
eligible recipient-customer accounts measured by the three-year-average (3) annual
consumption of energy over the previous three (3) years. A projected, annual consumption
of energy may be used until the actual three-year-average (3) annual consumption of
energy over the previous three (3) years at the eligible recipient-customer accounts
becomes available for use in determining eligibility of the generating system. The
community remote distributed-generation system may be owned by the same entity that
is the customer of record on the net-metered account or may be owned by a third party.
(6) "Core forest� refers to unfragmented forest blocks of single or multiple parcels totaling
two hundred fifty (250) acres or greater unbroken by development and at least twenty-five
(25) yards from mapped roads, with eligibility questions to be resolved by the director
of the department of environmental management. Such determination shall constitute
a contested case as defined in § 42-35-1. Notwithstanding any other provisions of this chapter, no renewable-distributed-generation
project that is located or planned to be located in or on a core forest, shall be
considered an eligible renewable-distributed-generation project or otherwise be eligible
to participate in this program, unless it is on a preferred site.
(7) "Distributed-generation facility� means an electrical-generation facility located
in the electric distribution company's load zone with a nameplate capacity no greater
than five megawatts (5 MW), except for solar projects as described in § 39-26.6-7 that may exceed five megawatts (5 MW) but shall not be greater than fifteen megawatts
(15 MW), unless located on preferred sites, in which case they may be sized up to
thirty-nine megawatts (39 MW), using eligible renewable energy resources as defined
by § 39-26-5, including biogas created as a result of anaerobic digestion, but, specifically excluding
all other listed eligible biomass fuels, and connected to an electrical power system
owned, controlled, or operated by the electric distribution company. For facilities
developed in core forests on preferred sites, no more than one hundred thousand square
feet (100,000 sq. ft.) of core forest shall be removed, except for work required for
utility interconnection or development of a brownfield, in which case no more core
forest than necessary for interconnection or brownfield development shall be removed.
For purposes of this chapter, a distributed-generation facility must be a new resource
that:
(i) Has not begun operation;
(ii) Is not under construction, but excluding preparatory site work that is less than twenty-five
percent (25%) of the estimated total project cost; and
(iii) Except for small-scale solar projects, does not have in place investment or lending
agreements necessary to finance the construction of the facility prior to the submittal
of an application or bid for which the payment of performance-based incentives is
sought under this chapter except to the extent that such financing agreements are
conditioned upon the project owner being awarded performance-based incentives under
the provisions of this chapter. For purposes of this definition, preexisting hydro
generation shall be exempt from the provisions of subsection (7)(i) regarding operation,
if the hydro-generation facility will need a material investment to restore or maintain
reliable and efficient operation and meet all regulatory, environmental, or operational
requirements. For purposes of this provision, "material investment� shall mean investment
necessary to allow the project to qualify as a new, renewable energy resource under
§ 39-26-2. To be eligible for this exemption, the hydro-project developer at the time of submitting
a bid in the applicable procurement must provide reasonable evidence with its bid
application showing the level of investment needed, along with any other facts that
support a finding that the investment is material, the determination of which shall
be a part of the bid review process set forth in § 39-26.6-16 for the award of bids.
(8) "Distributed-generation project� means a distinct installation of a distributed-generation
facility. An installation will be considered distinct if it does not violate the segmentation
prohibition set forth in § 39-26.6-9.
(9) "Electric distribution companyâ€� means a company defined in § 39-1-2(a)(12), supplying standard-offer service, last-resort service, or any successor service
to end-use customers, but not including the Block Island Power Company or the Pascoag
Utility District.
(10) "ISO-NE� means Independent System Operator-New England, the Regional Transmission
Organization for New England designated by the Federal Energy Regulatory Commission.
(11) "Large distributed-generation project� means a distributed-generation project that
has a nameplate capacity that exceeds the size of a small distributed-generation project
in a given year, but is no greater than five megawatts (5 MW) nameplate capacity.
(12) "Large-scale solar project� means a solar distributed-generation project with the
nameplate capacity specified in § 39-26.6-7.
(13) "Medium-scale solar project� means a solar distributed-generation project with the
nameplate capacity specified in § 39-26.6-7.
(14) "Office� means the Rhode Island office of energy resources.
(15) "Preferred sites� means a location for a renewable energy system that has had prior
development, including, but not limited to: landfills, gravel pits and quarries, highway
and major road median strips, brownfields, superfund sites, parking lots or sites
that are designated appropriate for carports, and all rooftops including, but not
limited to, residential, commercial, industrial and municipal buildings.
(16) "Program year� means a year beginning April 1 and ending March 31, except for the
first program year, that may commence after April 1, 2015, subject to commission approval.
(17) "Renewable energy certificate� means a New England Generation Information System renewable
energy certificate as defined in § 39-26-2(14).
(18) "Renewable energy classes� means categories for different renewable energy technologies
using eligible renewable energy resources as defined by § 39-26-5, including biogas created as a result of anaerobic digestion, but, specifically excluding
all other listed eligible biomass fuels specified in § 39-26-2(6). For each program year, in addition to the classes of solar distributed generation
specified in § 39-26.6-7, the board shall determine the renewable energy classes as are reasonably feasible
for use in meeting distributed-generation objectives from renewable energy resources
and are consistent with the goal of meeting the annual target for the program year.
The board may make recommendations to the commission to add, eliminate, or adjust
renewable energy classes for each program year, provided that the solar classifications
set forth in § 39-26.6-7 shall remain in effect for at least the first two (2) program years and no distributed-generation
project may exceed five megawatts (5 MW) of nameplate capacity except for solar projects
as described in § 39-26.6-7.
(19) "Shared solar facility� means a single small-scale or medium-scale solar facility
that must allocate bill credits to at least two (2), and no more than fifty (50),
accounts in the same customer class and on the same or adjacent parcels of land. Public
entities may allocate such bill credits to at least two (2), and up to fifty (50),
accounts without regard to physical location so long as the facility and accounts
are within the same municipality. In no case will the annual allocated credits in
KWh exceed the prior three-year (3) annual average usage, less any reductions for
verified energy-efficiency measures installed at the customer premises, of the customer
account to which the bill credits are transferred.
(20) "Small distributed-generation project� means a distributed-generation renewable energy
project that has a nameplate capacity within the following: Wind: fifty kilowatts
(50 KW) to one and one-half megawatts (1.5 MW); small-scale solar projects and medium-scale
solar projects with the capacity limits as specified in § 39-26.6-7. For technologies other than solar and wind, the board shall set the nameplate capacity-size
limits, but such limits may not exceed one megawatt (1 MW).
(21) "Small-scale solar project� means a solar distributed-generation project with the
nameplate capacity specified in § 39-26.6-7.