Oregon Statutes

§ 547.315 — Connecting existing improvements; procedure; connection with improvements outside district

Oregon § 547.315
JurisdictionOregon
Vol.15
Title 45Water Resources; Irrigation, Drainage, Flood Control, Reclamation
Ch. 547Drainage Districts

This text of Oregon § 547.315 (Connecting existing improvements; procedure; connection with improvements outside district) is published on Counsel Stack Legal Research, covering Oregon primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Or. Rev. Stat. § 547.315 (2026).

Text

(1)At the time of the construction in any district of the plan for reclamation, all ditches or systems of drainage already constructed in the district and all watercourses shall, if necessary to the drainage of any lands in the district, be connected with and made a part of the works and improvements of the plan of drainage of the district. But no ditches, drains or systems of drainage constructed in the district shall be connected therewith, unless the consent of the board of supervisors is first obtained. This consent shall be in writing and shall particularly describe the method, terms and conditions of such connection, and shall be approved by the chief engineer. The connections, if made, shall be in strict accord with the method, terms and conditions laid down in the consent.
(2)If

Free access — add to your briefcase to read the full text and ask questions with AI

Nearby Sections

15
View on official source ↗

Cite This Page — Counsel Stack

Bluebook (online)
Oregon § 547.315, Counsel Stack Legal Research, https://law.counselstack.com/statute/or/547.315.