Oregon Statutes
§ 469.717 — When installation to be completed
Oregon § 469.717
JurisdictionOregon
Vol.13
Title 36AHousing; Lottery and Games; Environment
Ch. 469Energy; Conservation Programs; Energy Facilities
This text of Oregon § 469.717 (When installation to be completed) is published on Counsel Stack Legal Research, covering Oregon primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.
Bluebook
Or. Rev. Stat. § 469.717 (2026).
Text
(1)Installation of the energy conservation measures must be completed within 90 days after receipt of loan funds. The State Department of Energy may provide an inspection at the owner’s request.
(2)Notwithstanding the provisions of subsection (1) of this section, the department may inspect installation of energy conservation measures to verify that all loan or other state subsidy funds have been used for energy conservation measures recommended in the audit, that installation has been performed in a workmanlike manner and that materials used satisfy prevailing industry standards. If requested to do so by the department, the dwelling owner shall provide the department with copies of receipts and any other documents verifying the cost of energy conservation measures.
Free access — add to your briefcase to read the full text and ask questions with AI
Legislative History
1987 c.749 §3
Nearby Sections
15
§ 469.010
Policy§ 469.020
Definitions§ 469.030
State Department of Energy; duties§ 469.040
Director; duties; appointment; rules§ 469.060
§ 469.060§ 469.067
Dispatchable standby generation program operated by public utility; annual reporting requirements§ 469.070
§ 469.070Cite This Page — Counsel Stack
Bluebook (online)
Oregon § 469.717, Counsel Stack Legal Research, https://law.counselstack.com/statute/or/469.717.