Oklahoma Statutes

§ 45-918 — Augering - Rules and procedures.

Oklahoma·Title 45 Mines And Mining

The following rules and procedures shall be complied with in dealing with augering: 1. Planning: before augering is done, advance planning shall be made to insure that no hazards shall be created affecting active underground workings. Auger mine workings and holes drilled shall be located so as to prevent:

(1)interference with the ventilation system of any underground mine, and (2) inundation hazards from the surface to active underground workings; 2. Inspection: a. at least fifty (50) feet on each side of highwalls being drilled shall be inspected for loose material before drilling or other work in the area is begun, and an inspection shall be made at least once during each operating shift, b. when abandoned mines or abandoned parts of active mines are penetrated by drilling, machinery s

Free access — add to your briefcase to read the full text and ask questions with AI

Oklahoma § 45-918 (Augering - Rules and procedures.) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Legislative History

Laws 1978, c. 148, § 18, emerg. eff. April 7, 1978.

Nearby Sections

15
View on official source ↗