Oklahoma Statutes

§ 45-915 — Electricity - Rules and procedures.

Oklahoma·Title 45 Mines And Mining
The following rules and procedures shall be complied with in dealing with electricity: 1. Circuits shall be protected against excessive overloads by fuses or circuit breakers of the correct type and capacity; 2. Powerlines and telephone circuits shall be protected against short circuits and lightning; 3. Electric equipment and circuits shall be provided with switches or other controls. Such switches or controls shall be of approved design and construction and shall be properly installed; 4. Individual overload protection or short-circuit protection shall be provided for the trailing cables of mobile equipment; 5. Power wires and cables shall have adequate current-carrying capacity and shall be protected from mechanical injury; 6. Neither crawler-mounted nor rubber-tired equipment shall run

Free access — add to your briefcase to read the full text and ask questions with AI

Oklahoma § 45-915 (Electricity - Rules and procedures.) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Legislative History

Laws 1978, c. 148, § 15, emerg. eff. April 7, 1978.

Nearby Sections

15
View on official source ↗