(a)The Department may at any time inspect any dam, including a dam that is otherwise exempt from this Part, upon receipt of a written request of any affected person or agency, or upon a motion of the Environmental Management Commission. Within the limits of available funds the Department shall endeavor to provide for inspection of all dams at intervals of approximately five years.
(a1) Coal combustion residuals surface impoundments, as defined by G.S. 130A-309.201, shall be inspected as provided in this subsection:
(1)The Department shall inspect each dam associated with a coal combustion residuals surface impoundment at least annually.
(2)The owner of a coal combustion residuals surface impoundment shall inspect the impoundment weekly and after storms to detect evidence of any of the f
Free access — add to your briefcase to read the full text and ask questions with AI
(a) The Department may at any time inspect any dam, including a dam that is otherwise exempt from this Part, upon receipt of a written request of any affected person or agency, or upon a motion of the Environmental Management Commission. Within the limits of available funds the Department shall endeavor to provide for inspection of all dams at intervals of approximately five years.
(a1) Coal combustion residuals surface impoundments, as defined by G.S. 130A-309.201, shall be inspected as provided in this subsection:
(1) The Department shall inspect each dam associated with a coal combustion residuals surface impoundment at least annually.
(2) The owner of a coal combustion residuals surface impoundment shall inspect the impoundment weekly and after storms to detect evidence of any of the following conditions:
a. Deterioration, malfunction, or improper operation of spillway control systems.
b. Sudden drops in the level of the contents of the impoundment.
c. Severe erosion or other signs of deterioration in dikes or other containment devices or structures.
d. New or enlarged seeps along the downstream slope or toe of the dike or other containment devices or structures.
e. Any other abnormal conditions at the impoundment that could pose a risk to public health, safety, or welfare; the environment; or natural resources.
(3) If any of the conditions described in subdivision (2) of this subsection are observed, the owner shall provide documentation of the conditions to the Department and a registered professional engineer. The registered professional engineer shall investigate the conditions and, if necessary, develop a plan of corrective action to be implemented by the owner of the impoundment. The owner of the impoundment shall provide documentation of the completed corrective action to the Department.
(4) The owner of a coal combustion residuals surface impoundment shall provide for the annual inspection of the impoundment by an independent registered professional engineer to ensure that the structural integrity and the design, operation, and maintenance of the impoundment is in accordance with generally accepted engineering standards. Within 30 days of the inspection, the owner shall provide to the Department the inspection report and a certification by the engineer that the impoundment is structurally sound and that the design, operation, and maintenance of the impoundment is in accordance with generally accepted engineering standards. The owner and the Department shall each place the inspection report and certification on a publicly accessible Internet Web site.
(b) If the Department upon inspection finds that any dam is not sufficiently strong, is not maintained in good repair or operating condition, is dangerous to life or property, or does not satisfy minimum streamflow requirements, the Department shall present its findings to the Commission and the Commission may issue an order directing the owner or owners of the dam to make at his or her expense maintenance, alterations, repairs, reconstruction, change in construction or location, or removal as may be deemed necessary by the Commission within a time limited by the order, not less than 90 days from the date of issuance of each order, except in the case of extreme danger to the safety of life or property, as provided by subsection (c) of this section.
(c) If at any time the condition of any dam becomes so dangerous to the safety of life or property, in the opinion of the Environmental Management Commission, as not to permit sufficient time for issuance of an order in the manner provided by subsection (b) of this section, the Environmental Management Commission may immediately take such measures as may be essential to provide emergency protection to life and property, including the lowering of the level of a reservoir by releasing water impounded or the destruction in whole or in part of the dam or reservoir. The Environmental Management Commission may recover the costs of such measures from the owner or owners by appropriate legal action.
(d) An order issued under this Part shall be served on the owner of the dam as provided in G.S. 1A-1, Rule 4. (1967, c. 1068, s. 10; 1973, c. 1262, s. 23; 1977, c. 878, s. 3; 1987, c. 827, s. 154; 1993, c. 394, s. 7; 2014-122, s. 10.)
§ 143-215.32A. Dam Safety Emergency Fund.
(a) Establishment; Purpose. - There is established the Dam Safety Emergency Fund within the Department, as set forth in this section. The Fund shall be used to defray expenses incurred by the Department in developing and implementing an emergency dam safety remedial plan and assessing overtopping risk for high hazard and intermediate hazard dams.
(b) Eligible Expenses. - The Fund may be used for the following expenses:
(1) Developing and implementing an emergency dam safety remedial plan that has been approved by the Department, including expenses incurred to contract with any third party for services related to plan development or implementation.
(2) Performing overtopping studies for dams categorized by the Department as high hazard or intermediate hazard for which the Department currently has no or inadequate overtopping risk information.
(c) Conditions for Use. - These funds shall be used upon the Department's determination that sufficient funds or corrective action cannot be obtained from other sources without incurring a delay that would significantly increase the threat to life or risk of damage to property or the environment.
(d) Cost Recovery. - Costs of site investigation and the development and implementation of an emergency dam safety remedial plan, including attorney's fees and other expenses of bringing the cost recovery action, may be recovered from the owners of the dam by appropriate legal action by the Commission. Funds recovered pursuant to this subsection shall be used to reimburse the Dam Safety Emergency Fund.
(e) Standards for Funded Activities. - Emergency dam safety remedial plan development and implementation activities and overtopping studies shall be conducted in accordance with standards set forth in G.S. 143-215.29. (2021-180, s. 12.10(a); 2023-134, s. 12.8.)