Montana Statutes
§ 85-15-211 — Inspection And Reports During Construction
Montana·Title 85 WATER USE·Ch. 15 DAM SAFETY ACT·Part 2 Construction, Inspection, and Repair of Dams
85-15-211 . Inspection and reports during construction.
(1)An engineer must be in charge of and responsible for inspections during construction of any high-hazard dam.
(2)Inspections during construction must be performed at intervals necessary to ensure conformity with the permit. The engineer in charge or a qualified designee shall perform the inspections.
(3)The department shall set procedures and requirements for reporting information obtained from, during, or as the result of an inspection. The engineer in charge shall certify all reports to the department.
(4)The department may also inspect the high-hazard dam during construction to ensure conformity with the construction permit.
(5)If the department finds that construction of the high-hazard dam does not conform with the constru
Free access — add to your briefcase to read the full text and ask questions with AI
Montana § 85-15-211 (Inspection And Reports During Construction) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.
Legislative History
En. Sec. 8, Ch. 501, L. 1985; amd. Sec. 4, Ch. 418, L. 1993.
Nearby Sections
15
§ 85-15-101
Renumbered 85-15-207§ 85-15-102
Renumbered 85-15-208§ 85-15-103
Repealed§ 85-15-104
Renumbered 85-15-107§ 85-15-105
Short Title§ 85-15-106
Definitions§ 85-15-107
Exemptions§ 85-15-108
Entry Upon Land§ 85-15-109
Legal Assistance§ 85-15-110
Rules§ 85-15-111
Through 85-15-114 Reserved§ 85-15-115
Purpose§ 85-15-201
Renumbered 85-15-306§ 85-15-202
Renumbered 85-15-307§ 85-15-203
Renumbered 85-15-308