Maine Statutes
§ 38 §480-O — Bulkheads and retaining walls on Scarborough River; permit requirements
Nothing in this article prohibits the rebuilding, replacement or new construction of a bulkhead, retaining wall or similar structure, provided that the applicant for a permit demonstrates to the department or municipality, as appropriate, that the following conditions are met.
1.Location.
The bulkhead or similar structure to be constructed, rebuilt or replaced is located along some or all of the north-northeasterly property lines of land abutting the Scarborough River from the jetty to the Scarborough town landing.
2.Termination.
The terminus of any bulkhead or similar structure, including any wing wall, unless connected to another bulkhead or similar structure, shall terminate at least 25 feet from any abutting property.
Any permit issued under this section for a bulkhead or similar str
Free access — add to your briefcase to read the full text and ask questions with AI
Maine § 38 §480-O (Bulkheads and retaining walls on Scarborough River; permit requirements) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.
Legislative History
PL 1987, c. 809, §2 (NEW). PL 1989, c. 890, §§A40,B81 (AMD). PL 2019, c. 285, §15 (AMD).
Nearby Sections
15
§ 38 §480-A
Findings; purpose; short title§ 38 §480-AA
Coastal sand dune rules§ 38 §480-B
Definitions§ 38 §480-C
Prohibitions§ 38 §480-D
Standards§ 38 §480-E
Permit processing requirements