Maine Statutes
§ 35-A §3135 — Physical connection between lines of utilities authorized
Maine § 35-A §3135
This text of Maine § 35-A §3135 (Physical connection between lines of utilities authorized) is published on Counsel Stack Legal Research, covering Maine primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.
Bluebook
Me. Rev. Stat. tit. 35-A, § 35-A §3135 (2026).
Text
1.Connection with feed lines.
A transmission and distribution utility may extend its lines to connect with the feed lines of any other transmission and distribution utility. The commission may fix such terms and conditions as will safeguard the rights and interests of both utilities.
2.Emergency connection and transport of energy.
The commission, in the interest of public convenience and necessity, may order any utility that is principally engaged in the transmission and distribution of electricity directly to the public or to be used ultimately by the public to transport temporarily electricity over its transmission or distribution facilities at a reasonable charge and in a manner as the commission directs when the transmission will alleviate an electric power shortage within this State
Free access — add to your briefcase to read the full text and ask questions with AI
Legislative History
PL 1987, c. 141, §A6 (NEW). PL 1999, c. 398, §A50 (AMD). PL 1999, c. 398, §§A104,105 (AFF).
Nearby Sections
15
§ 35 §1-A
Public Advocate§ 35 §1001
Fences; liability for injuries§ 35 §1002
Line fences built on notice of abutter§ 35 §101
Special privileges forbidden§ 35 §102
Unjust discrimination§ 35 §103
Rebates§ 35 §104
Affiliated interests§ 35 §104-A
Insider transactions§ 35 §105
Utility depositsCite This Page — Counsel Stack
Bluebook (online)
Maine § 35-A §3135, Counsel Stack Legal Research, https://law.counselstack.com/statute/me/35-A%20%C2%A73135.