Text

1.Investigation required. The nonwires alternative coordinator shall conduct an investigation of and make recommendations regarding nonwires alternatives to a wires project under section 3132, 3132‑A or 3132‑B in accordance with this section. The investigation must be conducted in coordination with the Efficiency Maine Trust. For the purposes of this section, "wires project" means a transmission line and associated infrastructure subject to the requirements of section 3132, a transmission project or subtransmission project as defined in section 3132‑A or a small transmission project or distribution project covered by section 3132‑B.
2.Investigation methods; benefit-cost analysis. An investigation under subsection 1 must set forth the total projected costs and annual carrying costs of the

Free access — add to your briefcase to read the full text and ask questions with AI

Legislative History

PL 2019, c. 298, §14 (NEW). PL 2023, c. 355, §§11, 12 (AMD).