Maryland Statutes

§ 15-519

Maryland·Article gen Environment·Title 15
(a)If the Department finds that the probable total annual production at all locations of a surface coal mining operator will not exceed 300,000 tons, the cost of the following activities, which shall be performed by a qualified public or private laboratory or such other public or private qualified entity designated by the Department, shall be assumed by the Department upon written request of the operator in connection with a permit application:
(1)The determination of probable hydrologic consequences required by § 15-505(c)(4) of this subtitle, including engineering analyses and designs necessary for the determination;
(2)The development of cross-section maps and plans required by § 15-505(c)(7) of this subtitle;
(3)The geologic drilling and state

Free access — add to your briefcase to read the full text and ask questions with AI

Maryland § 15-519 — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Nearby Sections

15
§ 15-1001
§ 15-1001
§ 15-101
§ 15-101
§ 15-1101
§ 15-1101
§ 15-1102
§ 15-1102
§ 15-1103
§ 15-1103
§ 15-1104
§ 15-1104
§ 15-1105
§ 15-1105
§ 15-1106
§ 15-1106
§ 15-1107
§ 15-1107
§ 15-1108
§ 15-1108
§ 15-1109
§ 15-1109
§ 15-1201
§ 15-1201
§ 15-1202
§ 15-1202
§ 15-1203
§ 15-1203
§ 15-1204
§ 15-1204
View on official source ↗