Massachusetts Statutes
§ 70 — Inspection of hot water heating boilers; changes in rules for construction of new boilers
Massachusetts·Part I ADMINISTRATION OF THE GOVERNMENT·Title XX PUBLIC SAFETY AND GOOD ORDER·Ch. 146 INSPECTION OF BOILERS, AIR TANKS, ETC. LICENSES OF ENGINEERS, FIREMEN, AND OPERATORS OF HOISTING MACHINERY
Section 70. All hot water heating boilers, except boilers specified in section seven, when used for space heating or as a heat storage source when the primary fluid circulates only within the code containment vessel or for process heating, and their appurtenances, that come within the scope of the current section one, four or eight of the American Society of Mechanical Engineers, Boiler and Pressure Vessel Code, hereinafter referred to as the ASME Code, shall be thoroughly inspected internally when construction permits at least once every three years and externally at least once a year.Changes in the rules which affect the construction of new boilers shall take effect six months after their filing, in the same manner prescribed for steam boilers in section two. The board may, upon request,
Free access — add to your briefcase to read the full text and ask questions with AI
Massachusetts § 70 (Inspection of hot water heating boilers; changes in rules for construction of new boilers) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.