Idaho Statutes

§ 42-3911 — FAILURE TO OBTAIN REQUIRED PERMIT OR SUBMIT REQUIRED INFORMATION — PENALTY

Idaho·Title 42 IRRIGATION AND DRAINAGE — WATER RIGHTS AND RECLAMATION·Ch. 39 INJECTION WELLS
Any owner or operator who causes to be constructed or consents either expressly or impliedly to the construction of a new deep injection well without having first obtained a permit therefor from the director of the department of water resources as provided in this chapter shall be guilty of a misdemeanor. Any owner or operator who causes an existing deep injection well to be modified or consents either expressly or impliedly to the modification of an existing deep injection well without having first obtained a permit therefor from the director of the department of water resources as provided in this chapter shall be guilty of a misdemeanor. Any owner or operator who operates and maintains a deep injection well without having first obtained a permit from the director of the department of wa

Free access — add to your briefcase to read the full text and ask questions with AI

Idaho § 42-3911 (FAILURE TO OBTAIN REQUIRED PERMIT OR SUBMIT REQUIRED INFORMATION — PENALTY) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Legislative History

[42-3911, added 1971, ch. 301, sec. 11, p. 1235; am. 1974, ch. 20, sec. 46, p. 533; am. 1984, ch. 155, sec. 12, p. 378; am. 2011, ch. 110, sec. 7, p. 290; am. 2024, ch. 20, sec. 5, p. 164.]

Nearby Sections

15
View on official source ↗