Idaho Statutes

§ 39-118A — ORE PROCESSING BY CYANIDATION

Idaho·Title 39 HEALTH AND SAFETY·Ch. 1 ENVIRONMENTAL QUALITY — HEALTH
(1)As used in this chapter, unless the context requires otherwise:
(a)"Application" means an application for a new or major modification permit.
(b)"As-built submittal" means a report regarding the constructed cyanidation facility that is stamped by an Idaho-licensed professional engineer and that is consistent with the criteria for as-built documentation and other supporting documents, including:
(i)As-built drawings; and
(ii)Quality assurance and quality control documentation demonstrating that the constructed cyanidation facility, including controls, substantially conforms to the final permit and issued for construction data package, if applicable.
(c)"Component or phase" means physical parts or locations of a cyanidation facility or temporal sequences of all or parts of a cyanida

Free access — add to your briefcase to read the full text and ask questions with AI

Idaho § 39-118A (ORE PROCESSING BY CYANIDATION) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Legislative History

[39-118A, added 2025, ch. 228, sec. 2, p. 1051.]

Nearby Sections

15
View on official source ↗