§ 34-1257.04 — Construction of facility.

District of Columbia § 34-1257.04
JurisdictionDistrict of Columbia
Title 34Public Utilities.
Ch. 12Cable Television.
Subch. IIOffice of Cable Television, Film, Music, and Entertainment Act of 2015.
Part GConstruction and Operation of the Cable System.

This text of District of Columbia § 34-1257.04 (Construction of facility.) is published on Counsel Stack Legal Research, covering District of Columbia primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
D.C. Code § 34-1257.04 (2026).

Text

(a)A cable operator shall complete construction of the cable system, and offer and deliver cable service in full compliance with this chapter and the franchise agreement.
(b)A cable operator shall use existing poles, conduits, and other facilities whenever possible, and shall not construct or install any new, different, or additional poles, conduits, or other facilities without the approval of the District. No location of any pole or wire-holding structure of a cable operator shall be a vested interest, and poles or structures shall be removed or modified by the cable operator at its own expense whenever the District determines that public convenience would be enhanced thereby.
(c)All transmission lines, equipment, and structures shall be so installed and located as to cause minimum i

Free access — add to your briefcase to read the full text and ask questions with AI

Legislative History

Aug. 21, 1982, D.C. Law 4-142, § 704; as added Oct. 9, 2002, D.C. Law 14-193, § 2(b), 49 DCR 7334