§ 4b-77 — Installation of level two electric vehicle charging stations at state facility. Inclusion of electric vehicle charging infrastructure at certain buildings in municipalities.
(a)As used in this section, (1) “electric vehicle charging station” has the same meaning as provided in section 16-19f, (2) “level two electric vehicle charging station” means an electric vehicle charging station that supplies two hundred eight to two hundred forty volt alternating current, and (3) “direct current fast charging station” means an electric vehicle charging station that utilizes direct current electricity providing forty kilowatts or greater.
(b)On and after January 1, 2023, the Commissioner of Administrative Services shall require each new construction of a state facility, the total project costs of which exceed one hundred thousand dollars, to be installed with level two electric vehicle charging stations in at least twenty per cent of the designated parking spaces for ca
Free access — add to your briefcase to read the full text and ask questions with AI
Connecticut § 4b-77 (Installation of level two electric vehicle charging stations at state facility. Inclusion of electric vehicle charging infrastructure at certain buildings in municipalities.) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.
Legislative History
(P.A. 22-25, S. 5.)