Connecticut Statutes

§ 4b-77 — Installation of level two electric vehicle charging stations at state facility. Inclusion of electric vehicle charging infrastructure at certain buildings in municipalities.

Connecticut § 4b-77
JurisdictionConnecticut
Title 4bState Real Property
Ch. 60Construction and Alterations of State Buildings

This text of Connecticut § 4b-77 (Installation of level two electric vehicle charging stations at state facility. Inclusion of electric vehicle charging infrastructure at certain buildings in municipalities.) is published on Counsel Stack Legal Research, covering Connecticut primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Conn. Gen. Stat. § 4b-77 (2026).

Text

(a)As used in this section, (1) “electric vehicle charging station” has the same meaning as provided in section 16-19f, (2) “level two electric vehicle charging station” means an electric vehicle charging station that supplies two hundred eight to two hundred forty volt alternating current, and (3) “direct current fast charging station” means an electric vehicle charging station that utilizes direct current electricity providing forty kilowatts or greater.
(b)On and after January 1, 2023, the Commissioner of Administrative Services shall require each new construction of a state facility, the total project costs of which exceed one hundred thousand dollars, to be installed with level two electric vehicle charging stations in at least twenty per cent of the designated parking spaces for ca

Free access — add to your briefcase to read the full text and ask questions with AI

Legislative History

(P.A. 22-25, S. 5.)

Nearby Sections

15
View on official source ↗

Cite This Page — Counsel Stack

Bluebook (online)
Connecticut § 4b-77, Counsel Stack Legal Research, https://law.counselstack.com/statute/ct/4b-77.