Connecticut Statutes
§ 25-85 — Establishment of flood prevention, climate resilience and erosion control system. Requirements of flood prevention, climate resilience and erosion control boards.
Connecticut § 25-85
JurisdictionConnecticut
Title 25Water Resources. Flood and Erosion Control
Ch. 477Flood Control and Beach Erosion
This text of Connecticut § 25-85 (Establishment of flood prevention, climate resilience and erosion control system. Requirements of flood prevention, climate resilience and erosion control boards.) is published on Counsel Stack Legal Research, covering Connecticut primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.
Bluebook
Conn. Gen. Stat. § 25-85 (2026).
Text
(a)Such board shall have authority, within the limits of appropriations from time to time made by the municipality or municipalities, as applicable, to plan, lay out, acquire, construct, reconstruct, repair, maintain, supervise, operate and manage a flood prevention, climate resilience and erosion control system. As used in sections 25-84 to 25-94, inclusive, “flood prevention, climate resilience and erosion control system” means any dike, berm, dam, piping, groin, jetty, sea wall, embankment, revetment, tide-gate, water storage area, ditch, drain or other structure or facility, and any nonstructural and nature-based measure, including, but not limited to, removal, relocation or modification of existing structures, restoration and maintenance of open floodplain or other water storage area
Free access — add to your briefcase to read the full text and ask questions with AI
Legislative History
(1955, S. 2384d; November, 1955, S. N207; June Sp. Sess. P.A. 83-38, S. 4; P.A. 21-115, S. 5.) History: June Sp. Sess. P.A. 83-38 provided that the definition of flood or erosion control system includes dams; P.A. 21-115 designated existing provisions as Subsec. (a) and amended same to add “, operate”, change defined term from “flood or erosion control system” to “flood prevention, climate resilience and erosion control system” and redefine same, and make technical and conforming changes, and added Subsec. (b) re planning considerations, effective July 1, 2021.
Nearby Sections
15
§ 25-102aa
Legislative finding.§ 25-102b
Definitions.§ 25-102bb
Definitions.§ 25-102c
Conservation zone designated.§ 25-102cc
Conservation zone designated.§ 25-102ee
Staff. Funds. Termination.Cite This Page — Counsel Stack
Bluebook (online)
Connecticut § 25-85, Counsel Stack Legal Research, https://law.counselstack.com/statute/ct/25-85.