Connecticut Statutes
§ 25-238a — Farmington River optimum flow. Dam release and holdback requests.
Connecticut § 25-238a
This text of Connecticut § 25-238a (Farmington River optimum flow. Dam release and holdback requests.) is published on Counsel Stack Legal Research, covering Connecticut primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.
Bluebook
Conn. Gen. Stat. § 25-238a (2026).
Text
(a)The Commissioner of Energy and Environmental Protection, in consultation with the Metropolitan District Commission, shall make Colebrook River Lake Dam release and holdback requests to the United States Army Corps of Engineers, as needed, to achieve an optimum flow in the Farmington River for:
(1)Fish and wildlife, (2) recreation, (3) the river's health, (4) flood risk reduction, (5) tourism, (6) hydropower, and (7) safety.
(b)Notwithstanding any provision of the general statutes or any special act, the Metropolitan District Commission shall release from the Goodwin Dam any amount of water released from the Colebrook Dam based on a request of the Commissioner of Energy and Environmental Protection in furtherance of the provisions of subsection (a) of this section.
Free access — add to your briefcase to read the full text and ask questions with AI
Legislative History
(P.A. 24-13, S. 1.) History: P.A. 24-13 effective May 14, 2024 (Revisor's note: In Subsec. (b), a reference to “Commissioner of Energy and Environmental” was changed editorially by the Revisors to “Commissioner of Energy and Environmental Protection” for accuracy).
Nearby Sections
15
§ 25-102aa
Legislative finding.§ 25-102b
Definitions.§ 25-102bb
Definitions.§ 25-102c
Conservation zone designated.§ 25-102cc
Conservation zone designated.§ 25-102ee
Staff. Funds. Termination.Cite This Page — Counsel Stack
Bluebook (online)
Connecticut § 25-238a, Counsel Stack Legal Research, https://law.counselstack.com/statute/ct/25-238a.