Connecticut Statutes

§ 25-238a — Farmington River optimum flow. Dam release and holdback requests.

Connecticut·Title 25 Water Resources. Flood and Erosion Control·Ch. 485 Multiple Use Rivers
(a)The Commissioner of Energy and Environmental Protection, in consultation with the Metropolitan District Commission, shall make Colebrook River Lake Dam release and holdback requests to the United States Army Corps of Engineers, as needed, to achieve an optimum flow in the Farmington River for:
(1)Fish and wildlife, (2) recreation, (3) the river's health, (4) flood risk reduction, (5) tourism, (6) hydropower, and (7) safety.
(b)Notwithstanding any provision of the general statutes or any special act, the Metropolitan District Commission shall release from the Goodwin Dam any amount of water released from the Colebrook Dam based on a request of the Commissioner of Energy and Environmental Protection in furtherance of the provisions of subsection (a) of this section.

Free access — add to your briefcase to read the full text and ask questions with AI

Connecticut § 25-238a (Farmington River optimum flow. Dam release and holdback requests.) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Legislative History

(P.A. 24-13, S. 1.) History: P.A. 24-13 effective May 14, 2024 (Revisor's note: In Subsec. (b), a reference to “Commissioner of Energy and Environmental” was changed editorially by the Revisors to “Commissioner of Energy and Environmental Protection” for accuracy).

Nearby Sections

15
View on official source ↗