(1) Every operator to
whom a permit is issued pursuant to the provisions of this article shall perform such
reclamation as is prescribed by the reclamation plan adopted pursuant to this
section.
(2) Reclamation plans shall be based upon provisions for, or satisfactory
explanation of, all general requirements for the type of reclamation chosen. The
details of the plan shall be appropriate to the type of reclamation designated by the
operator and shall be based upon the advice of experienced and technically trained
personnel.
(3) On the anniversary date of the permit each year, the operator shall
submit:
(a) A map showing the extent of current disturbances to affected land; and
(b) A report describing the affected land and the surrounding area, including:
(I) Changes over the preceding year regarding any disturbances to the
prevailing hydrologic balance;
(II) Changes over the preceding year regarding any disturbances to the
quality and quantity of water in surface and groundwater systems;
(III) Reclamation accomplished to date and during the preceding year;
(IV) New disturbances that are anticipated to occur during the upcoming
year; and
(V) Reclamation that will be performed during the upcoming year.
(4) All operators shall submit, in addition to the plan and map, an annual fee
as specified in section 34-32-127 (2).
(5) (Deleted by amendment, L. 91, p. 1435, � 9, effective July 1, 1991.)
(6) For operators who have filed an application pursuant to section 34-32-110
(1), the operator shall submit an annual fee as specified in section 34-32-127 (2) and
a map or sketch describing the acreage affected to date and the acreage reclaimed
to date.
(7) Reclamation plans and the implementation of reclamation plans must
conform to the following general requirements:
(a) Grading shall be carried on so as to create a final topography appropriate
to the final land use selected in accordance with paragraph (j) of this subsection (7).
(b) Earth dams shall be constructed, if necessary to impound water, if the
formation of such impoundments will not interfere with mining operations, damage
adjoining property, or conflict with water pollution laws, rules or regulations of the
federal government or the state of Colorado, or any local government pollution
ordinances.
(c) Acid-forming or toxic-producing material that has been mined shall be
handled in a manner that will protect the drainage system from pollution.
(d) All refuse shall be disposed in a manner that will control unsightliness, or
deleterious effects from such refuse.
(e) In those areas where revegetation is part of the reclamation plan, land
shall be revegetated in such a way as to establish a diverse, effective, and long-lasting vegetative cover that is capable of self-regeneration and at least equal in
extent of cover to the natural vegetation of the surrounding area. Native plant
species that encourage pollinators should receive first consideration, but
introduced species may be used in the revegetation process when found desirable
by the board.
(f) Where it is necessary to remove overburden in order to mine the mineral,
topsoil shall be removed from the affected land and segregated from other spoil. If
such topsoil is not replaced on a backfill area within a time short enough to avoid
deterioration of the topsoil, vegetative cover or other means shall be employed so
that the topsoil is preserved from wind and water erosion, remains free of any
contamination by other acid or toxic material, and is in a useable condition for
sustaining vegetation when restored during reclamation. If, in the discretion of the
board, such topsoil is of insufficient quantity or of poor quality for sustaining
vegetation or if other strata can be shown to be more suitable for vegetation
requirements, the operator shall remove, segregate, and preserve in a like manner
such other strata which are best able to support vegetation.
(g) (I) Disturbances to the prevailing hydrologic balance of the affected land
and of the surrounding area and to the quality and quantity of water in surface and
groundwater systems both during and after the mining operation and during
reclamation shall be minimized.
(II) Except as specified in subsections (7)(g)(III) and (7)(g)(IV) of this section, a
reclamation plan for a new or amended permit must demonstrate, by substantial
evidence, a reasonably foreseeable end date for any water quality treatment
necessary to ensure compliance with applicable water quality standards.
(III) The board may approve a reclamation plan that lacks substantial
evidence of a reasonably foreseeable end date for any necessary water quality
treatment if the new or amended permit includes an environmental protection plan
and reclamation plan adequate to ensure compliance with applicable water quality
standards and upon making a written determination:
(A) For an amended reclamation plan, except as provided in subsection
(7)(g)(III)(B) of this section, that the water quality impacts that have occurred or are
occurring for which no reasonably foreseeable end date for water quality treatment
can be established were either unforeseen at the time of approval of the
reclamation plan or existing at a mine site permitted before January 1, 2019; or
(B) For a new or amended reclamation plan for a permit involving a site that
was previously mined but was not permitted as of January 1, 2019, that existing
water quality conditions do not meet applicable water quality standards and no
reasonably foreseeable end date for water quality treatment can be established.
(IV) The board may approve a new reclamation plan that lacks substantial
evidence of a reasonably foreseeable end date for any necessary water quality
treatment if a permit application is submitted and the reclamation plan is limited to
reclamation of already-mined ore or other waste materials, including mine drainage
or runoff, as part of a cleanup.
(V) Nothing in this subsection (7)(g) allows the operator to avoid compliance
with other applicable statutory provisions governing well permits, augmentation
requirements, and replacement plans.
(h) Areas outside of the affected land shall be protected from slides or
damage occurring during the mining operation and reclamation.
(i) All surface areas of the affected land, including spoil piles, shall be
stabilized and protected so as to effectively control erosion and attendant air and
water pollution.
(j) On all affected land, the operator in consultation with the landowner
where possible, subject to the approval of the board, shall determine which parts of
the affected land shall be reclaimed for forest, range, crop, horticultural, homesite,
recreational, industrial, or other uses, including food, shelter, and ground cover for
wildlife. Prior to approving any new reclamation plan or approving a change in any
existing reclamation plan as provided in this section, the board shall confer with the
local board of county commissioners and the board of supervisors of the
conservation district if the mining operation is within the boundaries of a
conservation district. Reclamation shall be required on all the affected land.
(k) If the operator's choice of reclamation is forest planting, the operator
may, with the approval of the office, select the type of trees to be planted. Planting
methods and care of stock shall be governed by good planting practices. If the
operator is unable to acquire sufficient planting stock of desired tree species from
the state or elsewhere at a reasonable cost, the operator may defer planting until
planting stock is available to plant such land as originally planned, or may select an
alternate method of reclamation.
(l) The operator shall construct fire lanes or access roads when necessary
through the area to be planted. These lanes or roads shall be available for use by
the planting crews and shall serve as a means of access for supervision and
inspection of the planting work.
(m) On lands owned by the operator, the operator may permit the public to
use the same for recreational purposes, in accordance with the limited landowner
liability law contained in article 41 of title 33, C.R.S., except in areas where such use
is found by the operator to be hazardous or objectionable.
(n) If the operator's choice of reclamation is for range, the affected land
shall be restored to the satisfaction of the board to slopes commensurate with the
proposed land use and shall not be too steep to be traversed by livestock. The
legume seed shall be properly inoculated in all cases. The area may be seeded
either by hand or power or by the aerial method. The species of grasses and
legumes and the rates of seeding to be used per acre shall be determined primarily
by recommendations from the agricultural experiment stations established
pursuant to part 6 of article 31 of title 23 and experienced reclamation personnel of
the operator after considering other research or successful experience with range
seeding. No grazing shall be permitted on reclaimed land until the planting is firmly
established. The board, in consultation with the landowner and the local
conservation district, if any, shall determine when grazing may start.
(o) If the operator's choice of reclamation is for agricultural or horticultural
crops which normally require the use of farm equipment, the operator shall grade
so that the area can be traversed with farm machinery. Preparation for seeding or
planting, fertilization, and seeding or planting rates shall be governed by general
agricultural and horticultural practices, except where research or experience in
such operations differs with these practices.
(p) If the operator's choice of reclamation is for the development of the
affected land for homesite, recreational, industrial, or other uses, including food,
shelter, and ground cover for wildlife, the basic minimum requirements necessary
for such reclamation shall be agreed upon by the operator and the board.
(q) All reclamation provided for in this section shall be carried to completion
by the operator with all reasonable diligence and shall be conducted concurrently
with mining operations to the extent practicable, taking into consideration the mine
plan, mine safety, economics, the availability of equipment and material, and other
site-specific conditions relevant and unique to the affected land and to the
postmining land use. Upon termination of the entire mining operation and in
accordance with the reclamation plan, each phase of final reclamation shall be
completed within five years after the date on which the operator advises the board
that such phase has commenced, unless such period is extended by the board
pursuant to section 34-32-112 (7); except that:
(I) No planting of any kind shall be required to be made on any affected land
being used or proposed to be used by the operator for the deposit or disposal of
refuse until after the cessation of operations productive of such refuse, or proposed
for future mining, or within depressed haulage roads or final cuts while such roads
or final cuts are being used or made, or where permanent pools or lakes have been
formed.
(II) No planting of any kind shall be required on any affected land so long as
the chemical and physical characteristics of the surface and immediately
underlying material of such affected land are toxic, deficient in plant nutrients, or
composed of sand, gravel, shale, or stone to such an extent as to seriously inhibit
plant growth and such condition cannot feasibly be remedied by chemical
treatment, fertilization, replacement of overburden, or like measures. Where natural
weathering and leaching of any of such affected land, over a period of ten years
after commencement of reclamation, fails to remove the toxic and physical
characteristics inhibitory to plant growth or if, at any time within such ten-year
period, the board determines that any of such affected land is, and during the
remainder of said ten-year period will be, unplantable, the operator's obligations
under the provisions of this article with respect to such affected land may, with the
approval of the board, be discharged by reclamation of an equal number of acres of
land previously mined and owned by the operator not otherwise subject to
reclamation under this article.
(III) (A) With the approval of the board and the owner of the land to be
reclaimed, the operator may substitute land previously mined and owned by the
operator not otherwise subject to reclamation under this article or, in the
alternative, with the approval of the board and the owner of the land, reclamation of
an equal number of acres of any lands previously mined but not owned by the
operator if the operator has not previously abandoned unreclaimed mining lands.
The board also has authority to grant, in the alternative, the reclamation of lesser or
greater acreage so long as the cost of reclaiming such acreage is at least
equivalent to the cost of reclaiming the original permit lands. If any area is so
substituted, the operator shall submit a map of the substituted area, which map
shall conform to all of the requirements with respect to other maps required by this
article. Upon completion of reclamation of the substituted land, the operator shall
be relieved of all obligations under this article with respect to the land for which
substitution has been permitted.
(B) Sub-subparagraph (A) of this subparagraph (III) shall not apply to
uranium or in situ leach mining.
(IV) Reclamation may be completed in phases, and the five-year period may
be applied separately to each phase as it is commenced during the life of the mine.
(r) If affected land is owned by a legal entity other than any local, state, or
federal entity, any buildings or any structures having significant historical value
placed thereon during mining operations which are conducted in accordance with
paragraph (j) of this subsection (7) may remain on the affected land at the option of
the operator and landowner.
(8) All uranium extraction operations using in situ leach mining or recovery
methods, including any injection of any chemicals designed to mobilize uranium
resources, shall reclaim all affected groundwater for all water quality parameters
that are specifically identified in the baseline site characterization, or in the
statewide radioactive materials standards or tables 1 through 4 of the basic
standards for groundwater as established by the Colorado water quality control
commission, to either of the following:
(a) Premining baseline water quality or better as established by the baseline
site characterization conducted pursuant to section 34-32-112.5 (5); or
(b) That quality which meets the statewide radioactive materials standards
and the most stringent criteria set forth in tables 1 through 4 of the basic standards
for groundwater as established by the Colorado water quality control commission.
In establishing, designing, and implementing a groundwater reclamation plan, the
mine operator shall use best available technology.
(9) Operators of in situ leach mining operations shall take all necessary
steps to prevent and remediate any degradation of preexisting groundwater uses
during the prospecting, development, extraction, and reclamation phases of the
operation.