Arizona Statutes

§ 27-1253 — Approval; criteria

Arizona·Title 27 Arizona Revised Statutes·Ch. 6 AGGREGATE MINED LAND RECLAMATION·Art. 3 Exploration Operations Reclamation Plan

The state mine inspector shall approve a reclamation plan for exploration operations within sixty days after receiving a complete plan if the plan provides for the reclamation of surface disturbances at the exploration operations according to the following requirements, as applicable:

1.Exploration access roads that the operator constructs and that will not be part of a postexploration use shall be reclaimed in a timely manner after the exploration is completed. If a governmental unit or agency will accept dedication or conveyance of an access road, reclamation is not required. Reclamation shall include removing culverts, restoring drainage to its general predisturbance configuration, ripping the road surface to reduce compaction and aid revegetation and controlling access of motorized

Free access — add to your briefcase to read the full text and ask questions with AI

Arizona § 27-1253 (Approval; criteria) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Nearby Sections

15
View on official source ↗