STATE OF VERMONT SUPERIOR COURT ENVIRONMENTAL DIVISION Vermont Unit Docket No. 101-7-13 Vtec

Zaremba Group CU - Jericho DECISION ON THE MERITS

Stuart Alexander, Amy Booth, Peter Booth, Susan Bresee, William Bresee, Joe Faryniarz, Susan Filipek, Martin Fisher, Jennifer Hatch, Jeffrey Hill, Laura Hill, Friederike Keating, Sean McCann, Michelle Pinaud, Catherine Stevens, Michael Willey, Donna Wyatt, Sara Youngman, and Jon St. Amour (together, Appellants) appeal the Town of Jericho Development Review Board (DRB) decision approving the conditional use application of Zaremba Group, LLC (Zaremba) to construct a 9,100 square foot retail building and associated site improvements at 265 Vermont Route 15 in the Town of Jericho, Vermont (the Town). Zaremba filed a pre-trial motion for partial summary judgment asking this Court to dismiss Appellants Amy Booth, Joe Faryniarz, Susan Filipek, Martin Fisher, Jennifer Hatch, Jeffrey Hill, Laura Hill, Friederike Keating, Michelle Pinaud, Catherine Stevens, Michael Willey, Donna Wyatt, and Jon St. Amour (named Appellants) and to grant summary judgment in its favor as to their appeal. We concluded in an April 21, 2014 decision that the named Appellants did not participate and therefore have no standing in this appeal. Zaremba’s motion for partial summary judgment was therefore GRANTED, and Appellants Amy Booth, Joe Faryniarz, Susan Filipek, Martin Fisher, Jennifer Hatch, Jeffrey Hill, Laura Hill, Friederike Keating, Michelle Pinaud, Catherine Stevens, Michael Willey, Donna Wyatt, and Jon St. Amour were DISMISSED as appellants. In a second pretrial motion for partial summary judgment, Zaremba asked the Court to dismiss Appellant Stuart Alexander for lack of standing. In support of its motion, Zaremba argued that Dr. Alexander had not demonstrated a particularized injury different from the injury experienced by the general public. Specifically, Zaremba noted that Dr. Alexander owns property 3.5 miles from the project and that he drives by the project site approximately twice per week. We concluded in an April 21, 2014 decision that Dr. Alexander is not an interested 1 person under either § 4465(b)(4) or § 4465(b)(3). We therefore GRANTED Zaremba’s motion for partial summary judgment, and DISMISSED Dr. Alexander. Appearing at the site visit and merits hearing were Attorneys Alan P. Biederman and James Goss, representing Zaremba; Attorney James Allan Dumont, representing Appellants; and Albert W. Lindholm, participating as a self-represented litigant. Based upon the evidence presented at trial, including that which was put into context by the site visit, the Court renders the following Findings of Fact. Findings of Fact 1. Zaremba seeks conditional use approval to construct an approximately 9,100 square foot building (130 feet by 70 feet 9 inches) for a retail Dollar General Store at 265 Vermont Route 15 in Jericho, Vermont. 2. The building is proposed as a one-story structure 24 feet, 6 inches high with white clapboard siding to be located to the rear of the lot. 3. As proposed, the building roof has a pitch of 12/15 and will be constructed of black metal standing seam. 4. The Project lot, located within the Commercial zoning district, is approximately 1.92 acres and has 337.31 feet of frontage on Route 15. 5. The Project lot has a 50 foot front yard setback, 20 foot side yard setbacks, and a 20 foot rear yard setback. 6. The Project will cover approximately 43 percent of the Project lot. 7. Six faux windows are proposed to be located on the front of the building. 8. The Project will not involve outside display of items for sale or storage within the front yard setback. 9. Customer parking is proposed to be primarily located in front of the Project building with five additional spaces along the west side of the building for a total of 35 spaces. 10. Two signs are proposed for the Project. A 19 feet long and 18 inches high sign will be flush mounted on the front wall of the building. Five gooseneck lights will be located above the sign’s yellow letters. A second roadside sign will measure 3 feet 6 inches by 2 feet with black letters on a yellow background. The roadside sign will be mounted on a pedestal with a total height of 5 feet. 2 11. Project lighting will include five 16.5 foot tall pole mounted lights. Several wall mounted and canopy lights and motion detector activated security lights are also proposed. 12. The Project lighting will be Dark Sky compliant. 13. As proposed, the Project entails minor modifications to existing site topography. 14. Currently, there is minimal vegetation and trees on-site. Proposed landscaping will enhance the vegetation and trees. 15. The proposed landscaping includes five honey locust trees and three red oaks along Route 15, as well as a number of shrubs along the south edge of the parking area. Shrubs and bushes are proposed along the sides of the building. 16. A rain garden and perennial garden will be located along Route 15. 17. Two northwood maple trees, two red oak trees, spruce trees, rhododendrons, five crabapple trees, and numerous smaller plantings are proposed in the parking areas. 18. Plantings, including lilacs and arborvitae, are proposed on the east side of the Project building and may grow to heights of 15 to 20 feet. 19. The hours of operation of the Project will be 8:00 a.m. to 10:00 p.m., seven days per week. 20. The Project will have 8 to 12 employees: 2 full-time and 6 to 10 part-time. 21. Amy Booth resides with her husband Peter Booth at their residence at 352 Route 15 in Jericho, approximately eight-tenths of a mile from the Project site. 22. Both Peter and Amy Booth ride bicycles to and from their residence on Route 15 past the Project site. 23. The Booths will be able to see the Project as they bike in the area. 24. The Project is adjacent to Route 15 and will present new traffic interactions between vehicles and bicycles due to a new curb cut and turning movements. 25. Route 15 in the area of the Project has a 50 mile per hour speed limit. 26. The Route 15 corridor in the area of the Project is not a High Crash Location. 27. Intersection sight distances and stopping sight distances for the Project exceed Vermont Agency of Transportation (VTrans) minimum standards. 28. Peak hour traffic on Route 15 in the area of the Project is from 7:15 to 8:15 a.m. and 4:45 to 5:45 p.m. 3 29. Based on trip generation estimates from the Institute of Transportation Engineers (ITE), the Project will generate 10 new a.m. peak trips, 7 entering and 3 exiting. The Project will generate 46 new p.m. peak trips, 23 entering and 23 exiting. 30. The Project site will have a single curb cut access. 31. The Good Shepard Lutheran Church (the Church) is located adjacent to the east of the Project. 32. The Church has a curb cut on Route 15. 33. The Church has a parking lot in front of the building along Route 15 much like the Project’s proposed parking. 34. An existing curb cut located in the southeast corner of the Project lot, close to the driveway of the adjoining Church, will be eliminated and a new curb cut will be constructed at the southwest corner of the lot. The new curb cut will be approximately 36 feet wide and designed with two exit lanes (one left turn and one right turn) and one entrance lane. 35. A VTrans access permit has been obtained for the curb cut. 36. The curb cut will serve as access to any future development on what is currently vacant land to the west and north of the Project site. 37. The new separation distance between the existing Church driveway and the new curb cut conforms to VTrans regulations. 38. The Project will not have excessive queuing at the Project curb cut. 39. Level of Service (LOS) on Route 15 in the area of the new curb cut will operate at LOS A during a.m. and p.m. peak hours through 2018. Estimated LOS for left-turning vehicles approaching the Project will be LOS C for both a.m. and p.m.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Shapiro, Bernstein & Co. v. Continental Record Co.
386 F.2d 426 (Second Circuit, 1967)
In Re Amended Petition of UPC Vermont Wind, LLC
2009 VT 19 (Supreme Court of Vermont, 2009)
In Re Appeal of Trahan Nov
2008 VT 90 (Supreme Court of Vermont, 2008)
In Re Miller Subdivision Final Plan
2008 VT 74 (Supreme Court of Vermont, 2008)
In Re Quechee Lakes Corp.
580 A.2d 957 (Supreme Court of Vermont, 1990)
Town of Killington v. State
776 A.2d 395 (Supreme Court of Vermont, 2001)
LaBrie, Inc. v. Vermont Department of Environmental Conservation
596 A.2d 354 (Supreme Court of Vermont, 1991)
In Re Appeal of Miller
742 A.2d 1219 (Supreme Court of Vermont, 1999)
In Re Laberge Moto-Cross Track
2011 VT 1 (Supreme Court of Vermont, 2011)
In re Vermont National Bank
97 A.2d 317 (Supreme Court of Vermont, 1991)
In re Cross Pollination
2012 VT 29 (Supreme Court of Vermont, 2012)