Wewell v. City of Cincinnati

45 Ohio St. (N.S.) 407
Ohio Supreme Court·Decided November 22, 1887·Published

Opinion

Dickman, J.

In resisting the enforcement of the assessment in dispute, it is urged by the owners of the abutting property, that no estimate of the cost of the improvement, such as the law contemplates, was made and transmitted to the city council with the resolution or ordinance to improve ; and that consequently the municipality did not acquire jurisdiction to prosecute the work. The facts connected with this branch of the case seem not to be contested. A plan of sewerage for the district known and designated as Sewer Division No. 8, was approved by the city outhorities, and afterwards finally adopted April 28, 1878. The plan had previously been prepared by the [418]*418assistant engineer in charge of sewers, who, in submitting it to the chief engineer, embodied with it an estimate, as he regarded it, of the cost and expenses of the improvement. The assistant engineer estimated the total cost of the proposed sewers at the gross sum of about $80,000; and on the basis of such estimate, officially reported that the sewers could be constructed without cost to the city. The plan with the included estimate being approved by the chief engineer, it was by him submitted to the board of public works, which body adopted the same, and placed it on file — the estimate being thus explanatory of, and virtually a component part of the plan. The plan of sewerage being determined on, the board of city commissioners, the successor of the board of public works, in May, 1879, transmitted to the council and recommended for adoption, a resolution to- improve the designated streets and alleys according to the> plan on file ; and as set forth in the estimate accompanying the plan, reported to the council that the expense to the city would be none. The resolution, and an ordinance to construct the proposed sewers in accordance with the plan of the Eighth Sewerage Division, were thereupon properly adopted, and the improvement was made.

It is provided that in the building of sewers, the council may direct an estimate of the cost and expenses of constructing the work to be made. The special and controlling provision for such an estimate is found in section 2377, under the the subdivision of the Revised Statutes relating to sewers and assessments therefor, and reads as follows; After the plan of sewerage for the corporation, or any part thereof, has been approved by the board, and filed in the manner above pi'Ovided, the council may direct the engineer of the corporation, or sewerage engineer, as the case may be, to make an estimate of the cost and expenses of constructing the work, according to such plan, and report to the council what portion of the same will be required for main sewerage, and what portion for local sewerage, for any lots and lands to which any portion of such main sewer may serve as local sewer.”

The board referred to in this section, is, by a subsequent section, made to embrace the board of city commissioners in Cin[419]*419cinnati, or cities of the first grade of. the first class; and the question arises, whether in the case at bar, there has been a failure to fully meet the requirement of the statute as to making an estimate, whereby the assessment under consideration became necessarily void. The council did not direct the engineer of the corporation or sewerage engineer to submit an estimate; but through the estimate that accompanied the plan of sewerage, the council was put in possession of the required information. For the purpose in hand, the object of an estimate was attained. The cost of the work was not, it is true, estimated in detail, and was furnished only in gross; but the council was informed that the city would be put to no expense by the improvement that the entire cost would be about a certain specified sum, and would not exceed the amount that might be collected by assessment, or $2 per foot front of the abutting land. The rates fixed by the contract awarded showed the estimate to be accurate and within bounds, and based upon prices of labor and material unusually fair and reasonable. The estimate at the time it was prepared and submitted, was no doubt deemed adequate under the law; and although not sufficiently full and complete to be unexceptionable, we do not think it was so defective as to invalidate the assessment. The defect was not of that substantial character as to place it beyond the curative provisions of the Revised Statutes as embodied in section 2289 and section 2327. Those sections provide as follows :

“ Section 2289. In every such action (to enforce an assessment lien) the court shall disregard any technical irregularity or defect, whether in the proceedings of the board of improvements, or of the council, or of any officer of the corporation, or in the plans or estimates; and the acceptance of the work by the council on the certificate of the engineer, shall be presumptive evidence that the contract has been complied with, but a substantial defect in the construction of the improvement shall be a complete defense.

Section 2327. Proceedings with respect to improvements, shall be liberally construed by the councils and courts, to secure a speedy completion of the work at reasonable cost, and [420]*420the speedy collectioon of the assessment after the time has elapsed for its payment, and merely formal objections shall be disregarded; but the proceedings shall be strictly construed in favor of the owner of the property assessed or injured, as to the limitations on assessment of” private property, and compensation for damages sustained.”

The evident intent of these two sections is, that where the contract has been complied with, and the work accepted by the council; where there is no defect in the construction of the improvement; where the work has been completed at reasonable cost; where strict regard has been paid to the limitation on assessments on private property, any technical irregularity or defect in the plans or estimates, shall not avail to prevent the speedy collection of the assessment when due. Not only are merely formal objections to be disregarded, but the proceedings with respect to public improvements are to be liberally construed by the courts, and when the property-owner has received no injury from the improvement, but has been specially benefited thereby, he shall not be permitted, because of an unsubstantial defect, to evade payment of his proportion of the assessment.

It is furthermore contended that the assessment was premature and unauthorized, because all the streets had not been underlaid with sewers prior to the assessment; that Butler street from Third to Fifth street, and Seventh street from Scott alley to Culvert street, although included in the declaratory resolution, and in the ordinance ordering the improvement, were not provided with sewers, and that therefore the assessment was illegal and void. These two streets had never been graded to the established grade, and grading was necessary to support the sewers to be constructed therein; but the ordinance, which could not by law contain more than one subject clearly expressed, related solely to the construction of the sewers. Under that ordinance, no contract could be entered into except for the improvement according to the plan adopted. The streets, accordingly, in which grading was necessary before sewers could be built therein, were not included ki the contract with Kirchner & Ashman; and the property [421]*421abutting thereon, was not assessed for any part of the cost of the improvement. But as far practicable, and as far as authorized by law, the plan of sewerage was fully executed.

Free access — add to your briefcase to read the full text and ask questions with AI

Wewell v. City of Cincinnati, 45 Ohio St. (N.S.) 407 (Ohio 1887).

45 Ohio St. (N.S.) 407 (Wewell v. City of Cincinnati) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

Stuart v. . Palmer